NOTICE TO CONTRACTORS
FEDERAL AID SECONDARY
PROJECT NO. S-0607 (1)
COUNTIES OF CAMDEN
& BRANTLEY
Sealed proposals will be re
ceived by the State Highway
Department of Georgia at the
General Office at No. 2 Capitol
Square, Atlanta, Ga., until 11
A.M. Eastern Standard time,
May 3, 1957, and publicly opened
for furnishing all labor, mat
erial, equipment and other things
necessary for the construction of
13.628 miles of grading and pav
ing located in Camden and Bran
tley Counties on, what is locally
known at the Waverly-Atkinson
road, State Route 110. Beginning
at State Route 25, US Route 17,
in Waverly and extending north
west to State Route 50 approxi
mately 8 miles east of Nahunta.
Otherwise known as Federal Aid
Secondary Project S-0607 (1) in
Camden and Brantley counties.
The work will be let in one con
tract.
THE APPROXIMATE QUAN
TITIES ARE AS FOLLOWS:
164.311 Acres Clearing and
Grubbing Roadway - Lump Sum.
60.000 Acres Clearing and
Grubbing - Per Acre.
346.100 Cu. Yds. Unclassified
Excavation and Borrow, Includ
ing Ditches and Shoulders and
Including Material.
1100 Cu. Yds. Channel Excava
tion.
26,200,000 Sta. Yds. Overhaul
on Excavation.
1000 Cu. Yds. Subgrade Treat
ment Material, Including Mat
erial.
10000 Unit Yds. Overhaul on
Subgrade Treatment Material.
13.600 Miles Special Subgrade
Compaction.
1375 Cu. Yds. Excavation for
Culverts and Minor Structures.
183 Cu. Yds. Selected Material
Backfill, Culvert Foundation.
395 Cu. Yds. Class “A” Con
crete Culverts.
143 Cu. Yds. Class “B” Con
crete Headwalls.
30150 Lbs. Bar Reinforcing
Steel.
1482 Lin. Ft. 18” Pipe SD.
48 Lin. Ft. 24” Pipe SD
24 Lin. Ft. 30” Pipe SD
750 Lin. Ft. 18” Pipe CD
1640 Lin. Ft. 24” Pipe CD
1262 Lin. Ft. 30” Pipe CD
510 Lin. Ft. 36” Pipe CD
276 Lin. Ft. 42” Pipe CD
414 Lin. Ft. 48” Pipe CD
1600 Lin. Ft. 6” Perforated
Pipe Underdrain.
408 Lin. Ft. Culvert Pipe Re
moved, SD or CD
300 Lin. Ft. Culvert Pipe Re
laid, SR or CD.
LUMP SUM Remove Wood
Bridge, STATION 457-83.
154 Sq. Yds. Plain Sand Cement
Bag Rip Rap.
94 Each Concrete R W Markers.
2 Each Posts for FAP Markers.
2 Each Arrows for FAP Mark
ers.
2 Each Plates for FAP Markers.
254000 Sq. Yds. Sprigging
Slopes and Shoulders.
1920 Sq. Yds. Loose Sod Rip
Rap.
408 Sq. Yds. Sod Ditch Checks.
257 M. Gals. Water for Grass
ing.
32 Tons First Application Fer
tilizer.
7442 Lbs. Second Application
Fertilizer.
8 Each Reflectorized Guide
Markers, Type 5.
2 Each Reflectorized RR Cross
ing Warning Signs, Type "F”.
2 Each Reflectorized RR Cross
ing Stop Signs, Type “F”
2 Each Reflectorized RR Cross
Buck Signs, Type “E”
1 Each Concrete Spring Box.
120 Lin. Ft. 6” x 11” Concrete
Curb.
14 Sq. Yds. Traffic Stripe.
37 Tons Aggregate for Penetra
tion Macadam Base - RR Cross
ing.
580 Gals. Bituminous Material
for Penetration Macadam Base-
RR Crossing.
181400 Sq. Yds. 6” Soil Bitumin
ous Stabilized Base Course.
774600 Gals. Cutback Asphalt
Emulsion CBAE 2 or 3, Including
Seal.
174000 Sq. Yds. Asphalt Cement
Surface Treatment, Stone Size
4, Type 2.
17400 Sq. Yds. Asphalt Cement
Bituminous Seal.
152000 Sq. Yds. Finishing and
Dressing.
Said work shall begin within
ten (10) days after formal ex
ecution of contract and shall be
completed within 260 working
days. When contract has been ex
ecuted, written notice shall be
given the Contractor, at which
time, and not before, work may
be started.
Contract executed pursuant to
this Notice is binding on the State
Highway Department, as such.
Said contract will not create lia
bility, expressed or implied,
against the undersigned Chair
man of the State Highway Board,
as an individual nor against any
employee of the State Highway
Department, in his or her in
dividual capacity.
The minimum wage to be paid
under this contract shall be the
amounts set out in the Labor
Provisions included in the Pro
posal. The attention of bidders is
directed to the Special Provisions
covering employment of labor,
methods of construction, sublett-
ing or assigning the contract and
to the use of domestic materials.
Plans and specifications are on
file at the office of the under
signed at Atlanta, and at Savan
nah, Georgia, and at the office
of the Board of County Commis
sioners of Camden and Brantley
Counties at Woodbine & Nahunta,
Georgia, where they may be in
spected free of charge. Copies of
the plans may be obtained upon
payment in advance of the sum
of $24.00. Copies of the General
Specifications may be obtained
upon payment in advance of the
sum of $3.00, which sums will not
be refunded.
Proposals must be submitted on
regular forms, which will be
supplied by the undersigned, and
may be obtained by a payment,
in advance of $5.00 for each pro
posal issued. When the proposal
is submitted, it must be accom
panied by a certified check, cash
ier’s check, negotiable United
States Bonds, or other acceptable
security in the amount of $7500.-
00, and must be plainly marked
‘‘Proposal for Road Construction,”
County and Number, and show
the time of opening as advertised.
Check of the low bidder will be
cashed and all other checks will
be returned as soon as the con
tract is awarded, unless it is
deemed advisable by the State
Highway Department to hold one
or more checks. If an unusual
condition arises, the State High
way Department reserves the
right to cash all checks. Bidders
Bond will not be accepted. Bond
will be required of the successful
bidder as required by law.
Contracts will not be awarded
to contractors who have not been
placed on the list of qualified
Contractors prior to the date of
award. No proposal will be issued
to any bidder later than 9 A.M.
Eastern Standard Time of the
date of opening bids.
All bids must show totals for
each item and total amount of bid.
Right is reserved in the under
signed to delay the award of the
contract for a period not to ex
ceed thirty (30) days from the
which period bids shall remain
open and not subject to with
drawal. Right is also reserved in
the undersigned to reject any
and all bids and to waive all
formalities.
Upon compliance with the re
quirements of the Standard Spec
ifications, Ninety (90) percent of
the amount of work done in any
calendar month will be paid for
by the 25th. day of the succeed
ing month, provided that payrolls
have been submitted as required
and the remainder within thirty
(30) days after the Final State
ment is approved by the Engineer.
This the 15 day of April, 1957.
STATE HIGHWAY
DEPARTMENT OF GEORGIA
ROGER H. LAWSON
CHAIRMAN
NOTICE TO CONTRACTORS
FEDERAL AD PROJECT NO. F
085-1 (5) CONT. 1
COUNTY OF BRANTLEY
Sealed proposals will be re
ceived by the State Highway
Department of Georgia at the
General Office at No. 2 Capitol
Square, Atlanta, Ga., until 11
A.M., Eastern Standard time, May
3, 1957, and publicly opened for
furnishing all labor, material,
equipment and other things nec
essary for the construction of
six bridges on the new graded
section of the Nahunta-Jesup
road, State Route 23, US Route
301, located parallel to the pre
sent paved highway approxim
ately 5 miles north of Nahunta.
Otherwise known as Federal Aid
Project F 085-1 (5) Cont. 1 in
Brantley County. The work will
be let in one contract.
THE APPROXIMATE QUAN
TITIES FOR CONTRACT NO. 1
ARE AS FOLLOWS:
19.007 Acres Clearing and
Grubbing Bridge Site-Lump Sum-
4000 Cu. Yds. Channel Excava
tion.
2120 Sq. Yds. Remove Sand
Cement Block Rip Rap.
1620 Sq. Yds. Relay Sand
Cement Block Rip Rap.
150 Sq. Yds. Sand Cement
Block Rip Rap.
LUMP SUM Remove Existing
Bridge, Sta. 281x00.
LUMP SUM Remove Existing
Bridge, Sta. 301x50.
LUMP SUM Remove Existing
Bridge, Sta. 338x90.
LUMP SUM Remove Existing
Bridge, Sta. 406x70.
LUMP SUM Remove Existing
Bridge, Sta. 442x90.
LUMP SUM Remove Existing
Bridge, Sta. 422x90.
ALTERNATE NO. 1- PRES
TRESSED STRUCTURES.
LUMP SUM Superstructure
Complete - Bridge, Sta. 282x80.
LUMP SUM Superstructure
Complete - Bridge, Sta. 303x70.
LUMP SUM Superstructure
Complete - Bridge, Sta. 340x00.
LUMP SUM Superstructure
Complete - Bridge, Sta. 406x00.
LUMP SUM Superstructure
Complete - Bridge, Sta. 423x00.
LUMP SUM Superstructure
Complete - Bridge, Sta. 451x90.
674 Cu. Yds. Class “A” Con
crete.
113 Cu. Yds. Class “A” Con
crete Deposited in Water.
70782 Lbs. Bar Reinforcing
Steel.
14 Each Prestressed Concrete
Test Piles - 16”.
6 Each Loading Tests.
11670 Lin. Ft. Prestressed Con
crete Piling - 14”.
3920 Lin. Ft. Prestressed Con
crete Piling - 15”.
4 Each Timber Test Piles.
4320 Lin. Ft. Timber Piling -
Untreated.
590 Cu. Yds. Bridge Excavation
No. 1.
ALTERNATE NO. 2 - CONC.
BEAM SPANS & COMPOSITE
BEAM SPAN STRUCTURES.
LUMP SUM Superstructure
Complete - Bridge, Sta. 282x80.
LUMP SUM Superstructure
Complete - Bridge, Sta. 303x70.
LUMP SUM Superstructure
Complete - Bridge, Sta. 340x00.
LUMP SUM Superstructure
Complete - Bridge, Sta. 406x00.
LUMP SUM Superstructure
Complete - Bridge, Sta. 422x90.
LUMP SUM Superstructure
Complete - Bridge, Sta. 451x90.
724 Cu. Yds. Class “A” Con
crete.
200 Cu. Yds. Class “A” Con
crete Deposited in Water.
83209 Lbs. Bar Reinforcing
Steel.
14 Each Concrete Test Piles.
6 Each Loading Tests.
15710 Lin. Ft. Concrete Precast
Piling - 16”.
4 Each Timber Test Piles.
3600 Lin. Ft. Timber Piling -
Untreated.
Said work shall begin within
ten (10) days after formal ex
ecution of contract and shall be
completed within 300 working
days. When contract has been ex
ecuted, written notice shall be
given the Contractor, at which
time, and not before, work may
be started.
Contract executed pursuant to
this Notice is binding on the
State Highway Department, as
such. Said contract will not create
liability, expressed or implied,
against the undersigned Chair
man of the State Highway Board,
as an individual nor against any
employee of the State Highway
Department, in his or her indivi
dual capacity.
The minimum wage to be paid
under this contract shall be the
amounts set out in the Labor Pro
visions included in the Proposal.
The attention of bidders is direct
ed to the Special Provisions cov
ering employment of labor, meth
ods of construction, subletting or
assigning the contract and to the
use of domestic .materials.
Plans and specifications are on
file at the offfce of the under
signed at Atlanta, and at Savan
nah, Georgia, and at the office
of the Board of County Commis
sioners of Brantley County at
Nahunta, Georgia, where they
may be inspected free of charge.
Copies of the plans may be
obtained upon payment in adv
ance of the sum of SB.OO. Copies
of the General Specifications .may
be obtained upon payment in
advance of the sum of $3.00,
which sums will not refunded.
Proposals must be submitted
on regular forms, which will be
supplied by the undersigned, and
may be obtained by a payment,
in advance of $5.00 for each pro
posal issued. When the proposal
is submitted, it must be accom
panied by a certified check, cash
ier’s check, negotiable United
States Bonds, or other acceptable
security in the amount of $10,000.-
00, and must be plainly marked
“Proposal for Road Construc
tion,” County and Number, and
show the time of opening as adv
ertised. Check of the low bidder
will be cashed and all other
checks will be returned as soon
as the contract is awarded, un
less *it is deemed advisable by
the State Highway Department
to hold one or more checks. If
an unusual condition arises, the
State Highway Department re
serves the right to cash all checks.
Bidders Bond will not be accept
ed. Bond will be required of the
successful bidder as required by
law.
Contracts will not be awarded
to contractors who have not been
placed on the list of qualified
Contractors prior to the date of
award. No proposal will be issued
to any bidder later than 9 A.M.
Eastern Standard Time of the
date of opening bids. •
All bids must show totals for
each item and total amount of
bid. Right is reserved in the
undersigned to delay the award
of the contract for a period not
to exceed thirty (30) days from
the date of opening bids, during
which period bids shall remain
open and not subject to with
drawal. Right is also reserved in
the undersigned to reject any and
all bids and to waive all formali
ties.
Upon compliance with the re
quirements of the Standard
Specifications, Ninety (90) per
cent of the amount of work done
in any calendar month will be
paid for by the 25th. day of the
succeeding month, provided that
payrolls have been submitted as
required and the remainder with
in thirty (30) days after the Final
Statement is approved by the
Engineer.
This the 15 day of April, 1957.
STATE HIGHWAY
DEPARTMENT OF GEORGIA
ROGER H. LAWSON
CHAIRMAN
GEORGIA, Brantley County:
IN THE SUPERIOR COURT OF
SAID COUNTY.
TO WHOM IT MAY CONCERN:
Take notice that the Satilla
Missionary Baptist Church by and
through its duly elected and
authorized Board of Deacons has
filed in said Court a petition seek
ing to register the following lands
under the provisions of the Land
Registeration Law, to-wit:
“All that tract or parcel of
land situate, lying, and being in
the 3rd Land District of Bran
tley County, Georgia, containing
two acres, being a part of Lot
of Land Number 4, and being
more particularly described as
follows: Beginning at a concrete
post in the southwest corner of
said tract, thence running North
6 degrees East for a distance of
355.5 feet to a concrete post;
thence running South 72 degrees
45 minutes East for a distance
of 257.5 feet to a concrete post;
thence running South 6 degrees
West for a distance of 298 feet
to a concrete post; thence run
ning North 85 degrees 52 min
utes West for a distance of 253.2
feet to a concrete post, the point
or place of beginning, and bound
ed on the North, East, South, and
West by the lands of Roy Harp
er.”
You are warned to show Cause
to the contrary, if any you have,
before said Court on the 21st day
of May, 1957.
This 11th day of April, 1957.
D. F. Herrin
C. S. C. B. C.
J. Robert Smith
Attorney For Applicant 5|2.
Court of Ordinary, Brantley
County, Georgia.
To any Creditors and All Parties
at Interest:
Regarding Estate of C. S. Pem
ber formerly of Brantley County,
Georgia, notice is hereby given
that Leo Pember, sole heir, has
filed application with me to de
clare no administration necessary.
Said application will be heard
at my office Monday, May 6,
1957 and if no objection is made
an order will be passed saying
no administration necessary.
Claude A. Smith, Ordinary
March 21, 1957.
C. Winton Adams,
Petition’s Atty. 5|2.
Dr. Walter P. Little
Dr. Charles H. Little
OPTOMETRISTS
Isabella & Remshart Phone 5
WAYCROSS, GEORGIA
Golden Anniversary
INTERNATIONALS
COST LEAST TO OWN II । ili
NEW ACTION
NEW
We've got 'em! The golden achieve
ment of fifty years of quality truck
building—the great new light and
medium-duty Golden Anniversary
Internationals !
They’re new inside—new outside
new from name plate to tail gate.
They’re styled with a new look of
action, with the largest glass area.
The roomiest cabs. Exclusive new
cab mounting for a quieter, more
level ride New features throughout
— including the most powerful “six”
in their class!
See Them! Drive Them TODAY!
WILSON'S GARAGE
CLASSIFIED
ADS
Agent Wanted
Wanted — Saleslady or Sales
man to sell McNess Products part
or full time. Big profits. No ex
perience needed. Will teach and
finance you. Write today. Mc-
NESS CO., P. O. Box Box 2766
DeSoto Station, Memphis, Tenn.
5|2.
A WATKINS ROUTE IS OPEN
FOR BRANTLEY COUNTY. WO
MEN ARE AMONG OUR MOST
successful dealers.
WRITE THE J. R. WATKINS
COMPANY, 659 WEST PEACH
TREE ST., N. E., ATLANTA,
GEORGIA. 5|2.
WE HAVE BEEN APPOINTED AGENT FOR
COASTAL STATES LIFE INSURANCE COMPANY
FOR THIS SECTION. WE WILL BE GLAD TO
CONSULT WITH YOU CONCERNING YOUR LIFE
AND BURIAL INSURANCE NEEDS.
Ambulance Service
STYLING! MOST POWERFUL “SIX” I
FEATURES THROUGHOUT!
PHONE 2-2721
Announcement
Chambless Funeral Home
Phone 2-3855
We honor and accept all insurance policies,
including Family Fund.
New models, too!—lncluding the
beautiful new Golden Jubilee Pickup
. . . new Travelall®, combining finest
in station wagon and truck features
... new Cab-Forward models, priced
with the lowest . . . new models from
4,200 to 33,000 lbs. GVW—other
Internationals from the world’s
most complete truck line up to 96,000
lbs. GVW.
Come in right now and see ’em ...
drive ’em. Now’s the time to own the
trucks that are built to cost you least
to own!
Frigidaire for Sale
1949 Frigidaire for sale, good
condition, priced at SIOO. Mrs.
Thelma Sapp, Route 1, Nahunta,
Ga. Refrigerator may be seen at
Charlie O’Neal home on Route
2, Nahunta. 4|25.
Water Pumps for Sale .
One gas driven water pump
and one belt driven water pump
for sale. Dewey Lee, Phone 2-
2831, Nahunta, Ga. 4 25.
FOR SALE — One used Duster
for Super A Farmall. The
Blackshear Tractor and Imple
ment Co., Blackshear, Ga. ts.
FOR SALE — 14 used Ford trac
tors, $295.00 to $895.00. Black
shear Tractor and Implement
Co., Blackshear, Ga. ts.
FOR SALE — Corn Shelter that
shells 60 bushels an hour, $425.-
00. Blackshear Tractor and Im
plement Co., Blackshear, Ga. ts.
GUY CHAMBLESS
nil
international:
TRUCKS
NAHUNTA, GA.
J FILLING fc
PRESCRIPTIONS!
B IS OUR MOST
B IMPORTANT SERVICE ft
Knight-Vickers
Drug Store
Ernest Knight, Carey Jones,
Gordon Hardie, Pharmacists
Phone 2254 Jesup, Ga.
Lady Attendant
Nahunta, Ga.
■ fcr 1