Newspaper Page Text
WEDNESDAY, APRIL 11, 2018
BARROW NEWS-JOURNAL
PAGE 11C-W
Public Notices Continued
60°01’28.9” E a distance of
10.00 feet to a point 85.00
feet right of and opposite sta
tion 200+75.00 on said con
struction centerline laid out
for WEST WINDER BYPASS;
thence S 29°40’29.0” W a
distance of 64.07 feet back
to the point of BEGINNING.
Said described land being
a temporary easement for
the construction of a drive
way and as shown described
within on the attached plats
marked Annex 1-A.
Parcel 32 Driveway #2
BEGINNING at a point
55.00 feet right of and oppo
site station 202+75.00 on
the construction centerline
laid out for WEST WINDER
BYPASS on Georgia High
way Project PI. 0010554;
running thence N 32°05’56.4"
E a distance of 39.22 feet to
a point 55.00 feet right of and
opposite station 203+14.59
on said construction cen
terline laid out for WEST
WINDER BYPASS; thence S
57°32'07.7” E a distance of
40.00 feet to a point 95.00 feet
right of and opposite station
203+14.47 on said construc
tion centerline laid out WEST
WINDER BYPASS; thence S
32°05’54.2” W a distance of
38.84 feet to a point 95.00
feet right of and opposite sta
tion ‘202+75.00 on said con
struction centerline laid out
for WEST WINDER BYPASS;
thence N 58°05’32.2” W a
distance of 40.00 feet back
to the point of BEGINNING.
Said described land being
a temporary easement for
the construction of a drive
way and as shown described
within on the attached plats
marked Annex 1-A.
The title, estate or inter
est in the above described
lands, required by condemnor
and now taken by condemnor
for public use is as follows:
Fee simple title to the above
described lands as shown
described within on the plats
dated the 7th day of March,
2016; Last Revised: Sheet
Nos. 11 and 14 on November
13, 2017; Sheet Nos. 15 and
6 on March 14, 2017 and
attached to Appendix “A" to
Exhibit “A” as Annex 1-A.
Three permanent ease
ments are condemned for the
right to construct and main
tain slopes and are shown
described within on the
attached plats marked Annex
1-A.
Three temporary ease
ments are condemned for the
right to construct driveways
to connect the newly con
structed road and right of way
to the condemnees remain
ing lands for driveway pur
poses. Said easements will
expire on January 1, 2020
and as shown described on
the attached plats marked
Annex 1-A. Upon completion
of the project, the driveways
will remain in place for use by
the condemnees.
(AP4,11B/12610-320T2P)
Citation
In the Superior Court
of Barrow County
Georgia
DOCKET NO. 18CV-405-X
IN REM
DEPARTMENT OF
TRANSPORTATION
VS.
0.349 acres of land; and
certain easement rights; and
Kathy Lynn Helton; Un
named Tenant; and Barrow
County Tax Commissioner,
individually
The said named persons
and any and all other persons
known and unknown claiming
any right, title, power, interest,
ownership, equity, claim or
demand in and to the lands
hereinafter described, and all
occupants, tenants, lessees,
licensees and all holders,
owners and users of ways
and easements in, across,
over and under said land are
hereby notified, under the
provisions of the Official Code
of Georgia Annotated Sec
tions 32-3-4 through 32-3-19,
providing for the exercise of
the power of eminent domain
by the State of Georgia, or
any of its subdivisions, or by
any county of such State, as
follows:
That the above stated
case, being a condemnation
in rem against the property
hereinafter described, was
filed in said Court on the 20th
day of March 2018; That, in
accordance with provisions of
the aforesaid Official Code,
a Declaration of Taking, duly
authorized and properly
executed as provided by the
Official Code, has been made
and filed in said case, declar
ing the necessity for and
exercising the power of taking
the said described lands for
State-aid public road purpos
es, thereby vesting the title to
same in the Department of
Transportation; and, in pursu
ance of such authority, the
Department of Transporta
tion has deposited with the
Clerk of the Superior Court
of said County $12,560.00 as
the just compensation for the
said lands described; and all
persons claiming such fund or
any interest therein, are here
by required to make known
their claims to the Court;
In accordance with the pro
visions of the Official Code of
Georgia Annotated, the Plain
tiff-Condemnor has prayed
the Court for Immediate pos
session of said property, and
all persons having any inter
est in or claim against such
property, as above set forth,
are required by the Order of
the Judge of said Court to
surrender possession of the
property to the Department of
Transportation no later than
30 days from filing of the Dec
laration of Taking.
That in accordance with
the Official Code of Georgia
Annotated Section 32-3-13
through 32-3-19, if the owner,
or any of the owners, or any
person having a claim against
or interest in said property,
shall be dissatisfied with the
compensation, as estimated
in the Declaration of Taking
and deposited in Court, such
person or persons, or any of
them, shall have the right,
at any time subsequent to
the filing of the Declaration
and the deposit of the fund
into Court but not later than
30 days following the date
of service as provided for in
the Official Code of Georgia
Annotated Sections 32-3-8
through 32-3-10 to file with
the Court a notice of appeal,
the same to be in writing and
made a part of the record in
the proceedings.
The said property, as thus
affected, is described
as follows:
SEE PAGE 20-A; 20-B;
20-C; 20-D; 20-E; FOR
DESCRIPTION
This 23rd day of March,
2018.
/s/ Regina B. McIntyre,
Clerk
By Connie Y. Moore, Dep
uty Clerk
Clerk Superior Court
BARROW COUNTY
Project Number: 0010554
BARROW COUNTY
Parcel Numbers: 33
Required R/W: 0.349
acres of land; and certain
easement rights
Property Owner:
Kathy Lynn Helton; Un
named Tenant; and Barrow
County Tax Commissioner
All those tra cts or parcel of
land lying and being in 316th
Georgia Militia District in Bar-
row County, Georgia, being
more particularly described
as follows:
BEGINNING at a point
70.00 feet left of and opposite
station 215+25.00 on the con
struction centerline laid out for
WEST WINDER BYPASS on
Georgia Highway Project PI.
0010554; running thence N
61°17’43.9” W a distance of
25.00 feet to a point 95.00
feet left of and opposite sta
tion 215+25.00 on said con
struction centerline laid out
for WEST WINDER BYPASS;
thence N 28°29'01.2’' E a
distance of 22.24 feet to a
point 95.00 feet left of and
opposite station 215+47.97
on said construction cen
terline laid out for WEST
WINDER BYPASS; thence S
39°27'08.4” E a distance of
37.75 feet to a point 60.04
feet left of and opposite sta
tion 215+33.36 on said con
struction centerline laid out
for WEST WINDER BYPASS;
thence S 3r56’20.2” W a
distance of 816.50 feet to a
point 32.13 feet left of and
opposite station 207+10.37
on said construction cen
terline laid out for WEST
WINDER BYPASS; thence N
47°49’16.6” W a distance of
38.14 feet to a point 70.00
feet left of and opposite sta
tion 207+14.91 on said con
struction centerline laid out
for WEST WINDER BYPASS;
thence N 47°49’16.6" W a
distance of 25.18 feet to a
point 95.00 feet left of and
opposite station 207+17.91
on said construction cen
terline laid out for WEST
WINDER BYPASS; thence N
35°20’15.8” E a distance of
52.09 feet to a point 95.00
feet left of and opposite sta
tion 207+70.00 on said con
struction centerline laid out
for WEST WINDER BYPASS;
thence S 54°39’44.2'’ E a
distance of 25.00 feet to a
point 70.00 feet left of and
opposite station 207+70.00
on said construction cen
terline laid out for WEST
WINDER BYPASS; thence N
35°20’15.8” E a distance of
410.00 feet to a point 70.00
feet left of and opposite sta
tion 211+80.00 on said con
struction centerline laid out
for WEST WINDER BYPASS;
thence northeasterly 336.90
feet along the arc of a curve
(said curve having a radius
of 2910.00 feet and a chord
distance of 336.71 feet on a
bearing of N 32 o 01'15.9" E)
back to the point of BEGIN
NING. Said described land
being the required right of
way and as shown described
within on the attached plats
marked Annex 1 -A.
Also to be acquired by
condemnation are two per
manent easements for con
struction and maintenance
of slopes being described as
follows:
Permanent Easement #1
BEGINNING at a point
95.00 feet left of and opposite
station 207+70.00 on the con
struction centerline laid out for
WEST WINDER BYPASS on
Georgia Highway Project PI.
0010554; running thence N
42°11’07.8” E a distance of
209.68 feet to a point 70.00
feet left of and opposite sta
tion 209+78.18 on said con
struction centerline laid out
for WEST WINDER BYPASS;
thence S 35°20'15.8” W a
distance of 208.18 feet to a
point 70.00 feet left of and
opposite station 207+70.00
on said construction cen
terline laid out for WEST
WINDER BYPASS; thence N
54°3944.2" W a distance of
25.00 feet back to the point of
BEGINNING. Said described
land being a permanent ease
ment for the construction and
maintenance of slopes and
as shown described within
on the attached plats marked
Annex 1-A.
Permanent Easement #2
BEGINNING at a point
70.00 feet left of and opposite
station 211+80.00 on the con
struction centerline laid out for
WEST WINDER BYPASS on
Georgia Highway Project PI.
0010554; running thence S
35°20’15.8" W a distance of
50.00 feet to a point 70.00
feet left of and opposite sta
tion 211+30.00 on said con
struction centerline laid out
for WEST WINDER BYPASS;
thence N 12°47’38.0” E a
distance of 52.17 feet to a
point 90.00 feet left of and
opposite station 211+78.18
on said construction cen
terline laid out for WEST
WINDER BYPASS; thence N
39’01'44.0” E a distance of
118.81 feet to a point 80.00
feet left of and opposite sta
tion 213+00.00 on said con
struction centerline laid out
for WEST WINDER BYPASS;
thence N 31°41’04.6” E a
distance of 136.23 feet to a
point 80.00 feet left of and
opposite station 214+40.00
on said construction cen
terline laid out for WEST
WINDER BYPASS; thence N
19°13’04.6" E a distance of
83.85 feet to a point 95.00
feet left of and opposite sta
tion 215+25.00 on said con
struction centerline laid out
for WEST WINDER BYPASS;
thence S 61°17'43.9’' E a dis
tance of 25.00 feet to a point
70.00 feet left of and oppo
site station 215+25.00 on
said construction centerline
laid out for WEST WINDER
BYPASS; thence southwest
erly 336.90 feet along the arc
of a curve (said curve having
a radius of 2910.00 feet and a
chord distance of 336.71 feet
on a bearing of S 32°0115.9”
W) back to the point of
BEGINNING. Said described
land being a permanent ease
ment for the construction and
maintenance of slopes and
as shown described within
on the attached plats marked
Annex 1-A.
Fence Easement
BEGINNING at a point
on the southwestern prop
erty line of the condemnees,
said point being 95.00 feet
left of and opposite station
207+17.91 on the construc
tion centerline laid out for
WEST WINDER BYPASS on
Georgia Highway Project PI.
0010554; running thence N
47°49’16.6” W a distance of
5.04 feet to a point 100.00
feet left of and opposite sta
tion 207+18.51 on said con
struction centerline laid out
for WEST WINDER BYPASS;
thence N 35°20’15.8” E a
distance of 51.49 feet to a
point 100.00 feet left of and
opposite station 207+70.00
on said construction cen
terline laid out for WEST
WINDER BYPASS; thence
S 54°39’44.2” E a distance
of 5.00 feet to a point 95.00
feet left of and opposite sta
tion 207+70.00 on said con
struction centerline laid out
for WEST WINDER BYPASS;
thence S 35°20'15.8” W a
distance of 52.09 feet back
to the point of BEGINNING.
Said described land being a
temporary easement for the
construction of a fence and
as shown described within
on the attached plats marked
Annex 1-A.
Also to be acquired by con
demnation are two temporary
easements for construction of
driveways being described as
follows:
Driveway #1
BEGINNING at a point
70.00 feet left of and opposite
station 209+78.18 on the con
struction centerline laid out for
WEST WINDER BYPASS on
Georgia Highway Project PI.
0010554; running thence N
54°3944.2" W a distance of
10.00 feet to a point 80.00
feet left of and opposite sta
tion 209+78.18 on said con
struction centerline laid out
for WEST WINDER BYPASS;
thence N 35°20’15.8” E a
distance of 41.82 feet to a
point 80.00 feet left of and
opposite station 210+20.00
on said construction cen
terline laid out for WEST
WINDER BYPASS; thence S
54°3944.2" E a distance of
10.00 feet to a point 70.00
feet left of and opposite sta
tion 210+20.00 on said con
struction centerline laid out
for WEST WINDER BYPASS;
thence S 35°20'15.8” W a
distance of 41.82 feet back
to the point of BEGINNING.
Said described land being
a temporary easement for
the construction of a drive
way and as shown described
within on the attached plats
marked Annex 1-A.
Driveway #2
BEGINNING at a point
70.00 feet left of and opposite
station 211+30.00 on the
construction centerline
laid out for WEST WINDER
BYPASS on Georgia High
way Project PI. 0010554;
running thence N 54°39'44.2"
W a distance of 20.00 feet to
a point 90.00 feet left of and
opposite station 211+30.00
on said construction cen
terline laid out for WEST
WINDER BYPASS; thence N
35°20'15.8" E a distance of
48.18 feet to a point 90.00
feet left of and opposite sta
tion 211+78.18 on said con
struction centerline laid out
for WEST WINDER BYPASS;
thence S 12°47’38.0” W a
distance of 52.17 feet back
to the point of BEGINNING.
Said described land being
a temporary easement for
the construction of a drive
way and as shown described
within on the attached plats
marked Annex 1-A.
The title, estate or inter
est in the above described
lands, required by condemnor
and now taken by condemnor
for public use is as follows:
Fee simple title to the above
described lands as shown
described within on the plats
dated the 7th day of March,
2016; Last Revised: Sheet
Nos. 15 and 16 on March
14, 2017 and Sheet No. 17
on November 13, 2017 and
attached to Appendix “A" to
Exhibit “A" Annex 1-A.
Two permanent easement
are condemned for the right to
construct and maintain slopes
and are shown described
within on the attached plats
marked Annex 1-A.
A temporary easement is
condemned for the right to
construct a fence. Said ease
ment will expire on January 1,
2021 and is shown described
within on the attached plats
marked Annex 1-A. Upon
completion of the project, the
condemnees shall have the
right to use the easement
area in accordance with the
applicable zoning restrictions,
and the condemnor will cease
maintenance of the easement
area.
Two temporary easements
are condemned for the right
to construct driveways to
connect the newly construct
ed road and right of way to
the condemnees remaining
lands for driveway purposes.
Said easements will expire
on January 1, 2021 and as
shown described within on
the attached plats marked
Annex 1-A. Upon completion
of the project, the driveways
will remain in place for use by
the condemnees.
(AP4.11B/12610-220T2P) \
Citation
In the Superior Court
of Barrow County
Georgia
DOCKET NO. 18CV-406-X
IN REM
DEPARTMENT OF
TRANSPORTATION
VS.
0.877 acres of land; and
certain easement rights; and
Eva Jo Wall Helton; Eva Jo
Wall Helton and Kathy Lynn
Helton as Co-Trustees of the
Joe Allen Helton Testamen
tary Trust; Beneficiaries of
the Joe Allen Helton Testa
mentary Trust; and Barrow
County Tax Commissioner,
individually
The, said named persons
and any and all other persons
known and unknown claiming
any right, title, power, interest,
ownership, equity, claim or
demand in and to the lands
hereinafter described, and all
occupants, tenants, lessees,
licensees and all holders,
owners and users of ways
and easements in, across,
over and under said land are
hereby notified, under the
provisions of the Official Code
of Georgia. Annotated Sec
tions 32-3-4 through 32-3-19,
providing for the exercise of
the power of eminent domain
by the State of Georgia, or
any of its subdivisions, or by
any county of such State, as
follows:
That the above stated
case, being a condemnation
in rem against the property
hereinafter described, was
filed in said Court on the 20th
day of March, 2018; That, in
accordance with provisions of
the aforesaid Official Code,
a Declaration of Taking, duly
authorized and properly
executed as provided by the
Official Code, has been made
and filed in said case, declar
ing the necessity for and
exercising the power of taking
the said described lands for
State-aid public road purpos
es, thereby vesting the title to
same in the Department of
Transportation; and, in pursu
ance of such authority, the
Department of Transporta
tion has deposited with the
Clerk of the Superior Court
of said County $15,650.00 as
the just compensation for the
said lands described; and all
persons claiming such fund or
any interest therein, are here
by required to make known
their claims to the Court;
In accordance with the pro
visions of the Official Code of
Georgia Annotated, the Plain
tiff-Condemnor has prayed
the Court for Immediate pos
session of said property, and
all persons having any inter
est in or claim against such
property, as above set forth,
are required by the Order of
the Judge of said Court to
surrender possession of the
property to the Department of
Transportation no later than
30 days from filing of the Dec
laration of Taking.
That in accordance with
the Official Code of Georgia
Annotated Section 32-3-13
through 32-3-19, if the owner,
or any of the owners, or any
person having a claim against
or interest in said property,
shall be dissatisfied with the
compensation, as estimated
in the Declaration of Taking
and deposited in Court, such
person or persons, or any of
them, shall have the right,
at any time subsequent to
the filing of the Declaration
and the deposit of the fund
into Court but not later than
30 days following the date
of service as provided for in
the Official Code of Georgia
Annotated Sections 32-3-8
through 32-3-10 to file with
the Court a notice of appeal,
the same to be in writing and
made a part of the record in
the proceedings.
The said property, as thus
affected, is described
as follows:
SEE PAGE 20-A; 20-B;
20-C; FOR DESCRIPTION
This 23rd day of March,
2018.
/ s/ Regina B. McIntyre,
Clerk by
Connie Y. Moore, Deputy
Clerk
Clerk Superior Court
BARROW COUNTY
Project Number: 0010554
BARROW COUNTY
Parcel Numbers: 34
Required RAN: 0.877
acres of land; and certain
easement rights Property
Owner:
Eva Jo Wall Helton; Eva Jo
Wall Helton and Kathy Lynn
Helton as Co-Trustees of the
Joe Allen Helton Testamen
tary Trust; Beneficiaries of the
Joe Allen Helton Testamenta
ry Trust; and Barrow County
Tax Commissioner
All those tracts or parcel of
land lying and being in 316th
Georgia Militia District in Bar-
row County, Georgia, being
more particularly described
as follows:
BEGINNING at the point
of intersection between the
existing southeastern right of
way line of WEST WINDER
BYPASS with the existing
northwestern right of way line
of BURSON MADDOX RD,
said point being 27.91 feet
right of and opposite station
209+14.68 on the construc
tion centerline laid out for
WEST WINDER BYPASS on
Georgia Highway Project PI.
0010554; running thence N
32°27’52.4” E a distance of
301.96 feet to a point 13.00
feet right of and opposite sta
tion 212+16.11 on said con
struction centerline laid out
for WEST WINDER BYPASS;
thence N 29°12'57.2” E a
distance of 295.91 feet to a
point 0.40 feet left of and
opposite station 215+11.21
on said construction cen
terline laid out for WEST
WINDER BYPASS; thence S
39°42’05.8” E a distance of
75.44 feet to a point 70.00
feet right of and opposite sta
tion 214+84.40 on said con
struction centerline laid out
for WEST WINDER BYPASS;
thence S 32°04'11.3” W a
distance of 366.61 feet to a
point 75.00 feet right of and
opposite station 211+25.00
on said construction cen
terline laid out for WEST
WINDER BYPASS; thence S
57°07’49.7” E a distance of
79.91 feet to a point 30.53
feet left of and opposite sta
tion 92+35.00 on said con
struction centerline laid out
for BURSON MADDOX RD;
thence southwesterly 84.89
feet along the arc of a curve
(said curve having a radius of
3244.04 feet and a chord dis
tance of 84.88 feet on a bear
ing of S 64°58’31.6” W) to a
point 27.93 feet left of and
opposite station 91+41.81
on said construction cen
terline laid out for BURSON
MADDOX RD; thence S
65°43’29.9” W a distance of
76.58 feet to a point 13.97
feet right of and opposite sta
tion 90+71.56 on said con
struction centerline laid out
for BURSON MADDOX RD;
thence S 66°52'05,4” W a dis
tance of 79.11 feet to a point
32.76 feet right of and oppo
site station 209+21.18 on
said construction centerline
laid out for WEST WINDER
BYPASS; thence southwest
erly 8.12 feet along the arc
of a curve (said curve having
a radius of 45.00 feet and a
chord distance of 8.11 feet on
a bearing of S 72°02’19.2” W)
back to the point of BEGIN
NING. Said described land
being the required right of
way and as shown described
within on the attached plats
marked Annex 1-A.
Also to be acquired by
condemnation are two per
manent easements for con
struction and maintenance
of slopes being described as
follows:
Permanent Easement #1
BEGINNING at a point
on the northeastern proper
ty line of the condemnees,
said point being 90.00 feet
right of and opposite station
214+77.02 on the construc
tion centerline laid out for
WEST WINDER BYPASS on
Georgia Highway Project PI.
0010554; running thence S
31°19’16.0” W a distance of
360.30 feet to a point 100.00
feet right of and opposite sta
tion 211+26.08 on said con
struction centerline laid out
for WEST WINDER BYPASS;
thence N 57°07'49.7” W a
distance of 25.02 feet to a
point 75.00 feet right of and
opposite station 211+25.00
on said construction cen
terline laid out for WEST
WINDER BYPASS; thence N
32°04’11.3” E a distance of
366.61 feet to a point 70.00
feet right of and opposite sta
tion 214+84.40 on said con
struction centerline laid out
for WEST WINDER BYPASS;
thence S 39°42’05.4” E a
distance of 21.39 feet back
to the point of BEGINNING.
Said described land being
a permanent easement for
the construction and main
tenance of slopes and as
shown described within on
the attached plats marked
Annex 1-A.
Permanent Easement #2
BEGINNING at a point on
the existing northwestern right
of way line of BURSON MAD
DOX RD, said point being
30.53 feet left of and opposite
station 92+40.40 on the con
struction centerline laid out
for BURSON MADDOX RD
on Georgia Highway Project
P.l. 0010554; running thence
southwesterly 5.40 feet along
the arc of a curve (said curve
having a radius of 3244.04
feet and a chord distance
of 5.40 feet on a bearing of
S 64°10’52.0” W) to a point
30.53 feet left of and opposite
station 92+35.00 on said con
struction centerline laid out
for BURSON MADDOX RD;
thence N 57°07’49.7” W a dis
tance of 16.95 feet to a point
45.00 feet left of and opposite
station 92+26.18 on said con
struction centerline laid out
for BURSON MADDOX RD;
thence N 64°13’20.0” E a dis
tance of 33.82 feet to a point
45.00 feet left of and opposite
station 92+60.00 on said con
struction centerline laid out
for BURSON MADDOX RD;
thence N 89°50’37.9” E a dis
tance of 33.27 feet to a point
30.61 feet left of and opposite
station 92+90.00 on said con
struction centerline laid out
for BURSON MADDOX RD;
thence S 64°07'48.5” W a
distance of 49.60 feet back
to the point of BEGINNING.
Said described land being
a permanent easement for
the construction and main
tenance of slopes and as
shown described within on
the attached plats marked
Annex 1-A.
The title, estate or inter
est in the above described
lands, required by condemnor
and now taken by condemnor
for public use is as follows:
Fee simple title to the above
described lands as shown
described within on the plats
dated the 7th day of March,
2016; Last Revised: Sheet
Nos. 15 and 16 on March
14, 2017 and Sheet No. 17
on November 13, 2017 and
attached to Appendix “A” to
Exhibit “A” as Annex 1-A.
Two permanent easement
are condemned for the right to
construct and maintain slopes
and are shown described
within on the attached plats
marked Annex 1-A.
(AP4,11B/12610-160T2P) \
Citation
In the Superior Court
of Barrow County
Georgia
DOCKET NO. 18CV-407-M
IN REM
DEPARTMENT OF
TRANSPORTATION
VS.
0.270 acres of land; and
certain easement rights; and
Suk C. Kong; Susan
A. Kong; Arthur M. Galley;
Edgar Amador; and Barrow
County Tax Commissioner,
individually
The said named persons
and any and all other persons
known and unknown claiming
any right, title, power, interest,
ownership, equity, claim or
demand in and to the lands
hereinafter described, and all
occupants, tenants, lessees,
licensees and all holders,
owners and users of ways
and easements in, across,
over and under said land are
hereby notified, under the
provisions of the Official Code
of Georgia Annotated Sec
tions 32-3-4 through 32-3-19,
continued on following page