Newspaper Page Text
WEDNESDAY, APRIL 25, 2018
BARROW NEWS-JOURNAL
PAGE 9C-W
Public Notices Continued
thence N 36°05’17.8” W a dis
tance of 339.36 feet to a point
154.95 feet left of and oppo
site station 246+04.17 on said
construction centerline laid out
for MAINLINE WWBP; thence
N 43°19’03.5” E a distance of
18.80 feet to a point 146.24
feet left of and opposite sta
tion 246+20.83 on said con
struction centerline laid out for
MAINLINE WWBP; thence N
43°19’03.5” E a distance of
200.01 feet to a point 62.85
feet left of and opposite sta
tion 425+10.21 on said con
struction centerline laid out
for MATTHEWS SCHOOL
RD; thence S 44°22’02.9” E
a distance of 400.00 feet to a
point 22.28 feet right of and
opposite station 429+01.80 on
said construction centerline laid
out for MATTHEWS SCHOOL
RD; thence S 43°54’03.7” W
a distance of 276.09 feet back
to the point of BEGINNING.
Said described land being the
required right of way and is
for the total acquisition of said
parcel and as shown described
within on the attached plats
marked Annex 1-A.
The title, estate or interest
in the above described land
required by condemnor and
now taken by condemnor
for public use is as follows:
Fee simple title to the above
described land as shown
described within on the plats
dated the 7th day of April, 2016;
Last Revised: Sheet Nos. 6, 7
and 35 on January 12, 2018
and attached to Appendix “A” to
Exhibit “A” as Annex 1-A.
(AP25, MY2P2) \
Citation
In the Superior Court
of Barrow County
Georgia
DOCKET NO. 18CV-471 -B
IN REM
DEPARTMENT OF TRANS
PORTATION
VS.
3.966 acres of land; certain
easement rights; and certain
access rights; and Pierce
Hardy Limited Partnership, a
Pennsylvania limited partner
ship, individually
The said named persons
and any and all other persons
known and unknown claiming
any right, title, power, inter
est, ownership, equity, claim
or demand in and to the lands
hereinafter described, and all
occupants, tenants, lessees,
licensees and all holders, own
ers and users of ways and
easements in, across, over
and under said land are hereby
notified, under the provisions
of the Official Code of Geor
gia Annotated Sections 32-3-4
through 32-3-19, providing for
the exercise of the power of
eminent domain by the State of
Georgia, or any of its subdivi
sions, or by any county of such
State, as follows:
That the above stated case,
being a condemnation in rem
against the property hereinafter
described, was filed in said
Court on the 2 day of April,
2018; That, in accordance
with provisions of the afore
said Official Code, a Declara
tion of Taking, duly authorized
and properly executed as pro
vided by the Official Code, has
been made and filed in said
case, declaring the necessity
for and exercising the power
of taking the said described
lands for State-aid public road
purposes, thereby vesting the
title to same in the Depart
ment of Transportation; and,
in pursuance of such authority,
the Department of Transpor
tation has deposited with the
Clerk of the Superior Court of
said County $619,700.00 as
the just compensation for the
said lands described; and all
persons claiming such fund or
any interest therein, are hereby
required to make known their
claims to the Court;
In accordance with the provi
sions of the Official Code of
Georgia Annotated, the Plain
tiff-Condemnor has prayed the
Court for Immediate posses
sion of said property, and all
persons having any interest in
or claim against such property,
as above set forth, are required
by the Order of the Judge of
said Court to surrender pos
session of the property to the
Department of Transportation
no later than 30 days from filing
of the Declaration of Taking.
That in accordance with the
Official Code of Georgia Anno
tated Section 32-3-13 through
32-3-19, if the owner, or any of
the owners, or any person hav
ing a claim against or interest in
said property, shall be dissatis
fied with the compensation, as
estimated in the Declaration of
Taking and deposited in Court,
such person or persons, or any
of them, shall have the right,
at any time subsequent to the
filing of the Declaration and
the deposit of the fund into
Court but not later than 30 days
following the date of service
as provided for in the Official
Code of Georgia Annotated
Sections 32-3-8 through 32-3-
10 to file with the Court a notice
of appeal, the same to be in
writing and made a part of the
record in the proceedings.
The said property, as thus
affected, is described
as follows:
SEE PAGE 20-A; 20-B;
20-C; 20-D; 20-E; 20-F; FOR
DESCRIPTION
This 2 day of April, 2018.
Lois Riner
Chief Deputy Clerk Superior
Court
BARROW COUNTY
Project Number: CSSTP-
0006-00(327), PI. 0006327
BARROW COUNTY
Parcel Numbers: 14
Required R/W: 3.966 acres
of land; certain easement
rights; and 807.81 linear
feet of access rights
Property Owner: Pierce
Hardy Limited Partnership, a
Pennsylvania limited partner
ship
All those tracts or parcel of
land lying and being in 243rd
Georgia Militia District in Bar-
row County, Georgia, being
more particularly described as
follows:
Tract 1
BEGINNING at the point of
intersection between the south
western property line of the
condemnees with the existing
northern right of way line of
BANKHEAD HWY, said point
being 28.32 feet left of and
opposite station 500+29.59 on
the construction centerline of
MAINLINE WWBP on Georgia
Highway Project No. CSSTP-
0006-00(327), P.l. 0006327;
running thence N 37°32’56.6”
W a distance of 335.19 feet to
a point 40.92 feet right of and
opposite station 264+91.13 on
said construction centerline
laid out for MAINLINE WWBP;
thence S 89°36’33.1” W a dis
tance of 262.89 feet to a point
211.66 feet left of and opposite
station 264+18.22 on said con
struction centerline laid out for
MAINLINE WWBP; thence N
37°22’59.9” W a distance of
33.92 feet to a point 238.78
feet left of and opposite sta
tion 264+38.59 on said con
struction centerline laid out for
MAINLINE WWBP; thence N
79°00’41.0” E a distance of
6.74 feet to a point 232.77
feet left of and opposite sta
tion 264+41.62 on said con
struction centerline laid out for
MAINLINE WWBP; thence N
69°46’47.5” E a distance of
18.89 feet to a point 217.47
feet left of and opposite sta
tion 264+52.70 on said con
struction centerline laid out for
MAINLINE WWBP; thence N
82° 11’53.0” E a distance of
25.57 feet to a point 194.03
feet left of and opposite sta
tion 264+62.90 on said con
struction centerline laid out for
MAINLINE WWBP; thence N
36°24’54.0” E a distance of
21.62 feet to a point 186.39
feet left of and opposite sta
tion 264+83.12 on said con
struction centerline laid out for
MAINLINE WWBP; thence N
57°13’08.9” E a distance of
25.04 feet to a point 169.79
feet left of and opposite sta
tion 265+01.87 on said con
struction centerline laid out for
MAINLINE WWBP; thence N
18°46’34.6” W a distance of
16.19 feet to a point 178.96
feet left of and opposite sta
tion 265+15.22 on said con
struction centerline laid out for
MAINLINE WWBP; thence N
56°46’09.4” W a distance of
16.26 feet to a point 194.46
feet left of and opposite sta
tion 265+20.11 on said con
struction centerline laid out for
MAINLINE WWBP; thence S
89°54’24.9” W a distance of
16.05 feet to a point 209.90
feet left of and opposite sta
tion 265+15.74 on said con
struction centerline laid out for
MAINLINE WWBP; thence
N 9°27’12.6” W a distance of
22.42 feet to a point 219.44
feet left of and opposite sta
tion 265+36.03 on said con
struction centerline laid out for
MAINLINE WWBP; thence N
55°31’54.5” E a distance of
17.29 feet to a point 208.37
feet left of and opposite sta
tion 265+49.31 on said con
struction centerline laid out for
MAINLINE WWBP; thence N
67°37’59.4” E a distance of
46.37 feet to a point 171.86
feet left of and opposite sta
tion 265+77.91 on said con
struction centerline laid out for
MAINLINE WWBP; thence N
37°06’20.4” E a distance of
30.17 feet to a point 160.86
feet left of and opposite sta
tion 266+06.00 on said con
struction centerline laid out for
MAINLINE WWBP; thence N
36°42’18.1” E a distance of
28.33 feet to a point 150.71
feet left of and opposite sta
tion 266+32.45 on said con
struction centerline laid out for
MAINLINE WWBP; thence N
31°20’34.9” E a distance of
309.00 feet to a point 80.42
feet left of and opposite sta
tion 269+16.39 on said con
struction centerline laid out for
MAINLINE WWBP; thence N
52°17’53.5” E a distance of
174.75 feet to a point 19.49
feet left of and opposite sta
tion 270+70.08 on said con
struction centerline laid out for
MAINLINE WWBP; thence S
36°53’54.5” E a distance of
136.54 feet to a point 111.35
feet right of and opposite sta
tion 270+28.19 on said con
struction centerline laid out for
MAINLINE WWBP; thence
southwesterly 122.03 feet
along the arc of a curve (said
curve having a radius of 269.79
feet and a chord distance of
120.99 feet on a bearing of
S 32°39’01.1” W) to a point
104.00 feet right of and oppo
site station 268+86.30 on said
construction centerline laid out
for MAINLINE WWBP; thence
S 14°24’21.2” W a distance of
221.74 feet to a point 115.00
feet right of and opposite sta
tion 266+50.00 on said con
struction centerline laid out for
MAINLINE WWBP; thence
S 2°16’46.9” E a distance of
145.70 feet to a point 160.00
feet right of and opposite sta
tion 265+11.42 on said con
struction centerline laid out for
MAINLINE WWBP; thence S
35°03’33.2” E a distance of
168.95 feet to a point 143.00
feet left of and opposite sta
tion 500+43.00 on said con
struction centerline laid out
for BANKHEAD HWY; thence
S 6°24’53.2” W a distance of
115.47 feet back to the point of
BEGINNING. Said described
land being the required right of
way and as shown described
within on the attached plats
marked Annex 1-A.
Tract 2
BEGINNING at a point on
the existing northern right of
way line of BANKHEAD HWY,
said point being 28.29 feet
left of and opposite station
502+19.00 on the construction
centerline of BANKHEAD HWY
on Georgia Highway Project
No. CSSTP-0006-00(327),
P.l. 0006327; running thence
N 0°15’15.3” W a distance of
26.71 feet to a point 55.00
feet left of and opposite sta
tion 502+19.00 on said con
struction centerline laid out for
BANKHEAD HWY; thence N
89°38’50.5” E a distance of
373.45 feet to a point 56.00
feet left of and opposite sta
tion 505+92.00 on said con
struction centerline laid out for
BANKHEAD HWY; thence N
51°57’07.8” E a distance of
98.90 feet to a point 62.79
feet left of and opposite sta
tion 579+13.00 on said con
struction centerline laid out
for BANKHEAD HWY; thence
S 0°06’24.9” W a distance of
88.02 feet to a point 29.22
feet left of and opposite sta
tion 506+69.82 on said con
struction centerline laid out for
BANKHEAD HWY; thence S
89°45’10.5” W a distance of
451.05 feet back to the point of
BEGINNING. Said described
land being the required right of
way and as shown described
within on the attached plats
marked Annex 1-A.
Permanent Easement
BEGINNING at a point on
the existing northern right of
way line of BANKHEAD HWY,
said point being 28.32 feet
left of and opposite station
500+29.59 on the construction
centerline of BANKHEAD HWY
on Georgia Highway Project
No. CSSTP-0006-00(327), P.l.
0006327; running thence N
6°24’53.2” E a distance of 3.71
feet to a point 32.00 feet left of
and opposite station 500+30.02
on said construction centerline
laid out for BANKHEAD HWY;
thence N 86°31’14.7” E a dis
tance of 142.20 feet to a point
40.00 feet left of and opposite
station 501+72.00 on said con
struction centerline laid out for
BANKHEAD HWY; thence N
72°02’43.1” E a distance of
49.34 feet to a point 55.00
feet left of and opposite sta
tion 502+19.00 on said con
struction centerline laid out
for BANKHEAD HWY; thence
S 0°15’15.3” E a distance of
26.71 feet to a point 28.29
feet left of and opposite sta
tion 502+19.00 on said con
struction centerline laid out for
BANKHEAD HWY; thence S
89°45’10.5” W a distance of
189.41 feet back to the point of
BEGINNING. Said described
land being a permanent ease
ment for the construction of
slopes and as shown described
within on the attached plats
marked Annex 1-A.
Driveway
BEGINNING at a point 55.33
feet left of and opposite station
504+05.00 on the construction
centerline of BANKHEAD HWY
on Georgia Highway Project
No. CSSTP-0006-00(327), P.l.
0006327; running thence N
0°15’15.3” W a distance of 9.99
feet to a point 65.32 feet left of
and opposite station 504+05.00
on said construction centerline
laid out for BANKHEAD HWY;
thence N 89°38’50.5” E a dis
tance of 65.00 feet to a point
65.43 feet left of and opposite
station 504+70.00 on said con
struction centerline laid out for
BANKHEAD HWY; thence S
0°15’15.0” E a distance of 9.99
feet to a point 55.44 feet left of
and opposite station 504+70.00
on said construction centerline
laid out for BANKHEAD HWY;
thence S 89°38’50.5” W a dis
tance of 65.00 feet back to the
point of BEGINNING. Said
described land being a tem
porary easement for the con
struction of a driveway and as
shown described within on the
attached plats marked Annex
1-A.
Also to be acquired is 807.81
linear feet of access rights
described as follows:
Limited Access 1
BEGINNING at a point on
the existing northern right of
way line of BANKHEAD HWY,
said point being 28.32 feet
left of and opposite station
500+29.59 on the construction
centerline of BANKHEAD HWY
on Georgia Highway Project
No. CSSTP-0006-00(327),
P.l. 0006327; running thence
N 6°24’53.2” E a distance of
115.47 feet to a point 143.00
feet left of and opposite sta
tion 500+43.00 on said con
struction centerline laid out for
BANKHEAD HWY; thence N
35°03’33.2” W a distance of
168.95 feet to a point 160.00
feet right of and opposite sta
tion 265+11.42 on said con
struction centerline laid out for
MAINLINE WWBP; thence
N 2°16’46.9” W a distance of
145.70 feet to a point 115.00
feet right of and opposite sta
tion 266+50.00 on said con
struction centerline laid out for
MAINLINE WWBP; thence N
14°24’21.2” E a distance of
221.74 feet ending at a point
104.00 feet right of and oppo
site station 268+86.30 on said
construction centerline laid out
for MAINLINE WWBP.
Limited Access 2
BEGINNING at a point on
the southwestern property line
of the condemnees, said point
being 211.66 feet left of and
opposite station 264+18.22 on
the construction centerline of
MAINLINE WWBP on Georgia
Highway Project No. CSSTP-
0006-00(327), P.l. 0006327;
running thence N 37°22’59.9”
W a distance of 33.92 feet end
ing at a point 238.78 feet left of
and opposite station 264+38.59
on said construction centerline
laid out for MAINLINE WWBP.
Said descriptions are for the
total acquisition of 807.81 lin
ear feet of access rights and as
shown described within on the
attached plats marked Annex
1-A.
The title, estate or inter
est in the above described
lands, required by condemnor
and now taken by condem
nor for public use as rights of
way for a LIMITED ACCESS
HIGHWAY as defined under
the Official Code of Georgia
Annotated sections 32-6-110
through 32-6-119 is as fol
lows: Fee simple title to the
above described access rights
all as shown described within
on the attached plats marked
Annex 1-A. Said access rights
being required between the
condemnees remaining real
property and existing roads,
streets or highways, intersect
ing or adjacent to the LIMITED
ACCESS HIGHWAY, such
access rights being specifically
delineated on Department of
Transportation plats dated the
7th day of April, 2016; Last
Revised: Sheet Nos. 10, 11
and 38 on February 13, 2018,
and Sheet No. 8 on July 31,
2017 and attached to Appendix
“A” to Exhibit “A” Annex 1-A.
A permanent easement is
condemned for the right to con
struct and maintain slopes to
connect the newly constructed
road and right of way to the
condemnees remaining lands
and as shown described within
on the attached plats marked
Annex 1-A.
A temporary easement is
condemned for the right to con
struct a driveway to connect
the newly constructed road and
right of way to the condemnees
remaining lands for driveway
purposes. Said easement will
expire on January 1, 2020 and
as shown described within
on the attached plats marked
Annex 1-A. pon completion of
the project, the driveway will
remain in place for use by the
condemnees.
(AP25, MY2P2) \
Citation
In the Superior Court
of Barrow County
Georgia
DOCKET NO. 18CV-472-B
IN REM
DEPARTMENT OF TRANS
PORTATION
VS.
0.449 acres of land; and cer
tain easement rights; and
Pierce Hardy Limited Part
nership, a Pennsylvania limited
partnership, individually
The said named persons
and any and all other persons
known and unknown claiming
any right, title, power, inter
est, ownership, equity, claim
or demand in and to the lands
hereinafter described, and all
occupants, tenants, lessees,
licensees and all holders, own
ers and users of ways and
easements in, across, over
and under said land are hereby
notified, under the provisions
of the Official Code of Geor
gia Annotated Sections 32-3-4
through 32-3-19, providing for
the exercise of the power of
eminent domain by the State of
Georgia, or any of its subdivi
sions, or by any county of such
State, as follows:
That the above stated case,
being a condemnation in rem
against the property hereinafter
described, was filed in said
Court on the 2 day of April,
2018; That, in accordance
with provisions of the afore
said Official Code, a Declara
tion of Taking, duly authorized
and properly executed as pro
vided by the Official Code, has
been made and filed in said
case, declaring the necessity
for and exercising the power
of taking the said described
lands for State-aid public road
purposes, thereby vesting the
title to same in the Depart
ment of Transportation; and,
in pursuance of such author
ity, the Department of Trans
portation has deposited with
the Clerk of the Superior Court
of said County $4,120.00 as
the just compensation for the
said lands described; and all
persons claiming such fund or
any interest therein, are hereby
required to make known their
claims to the Court;
In accordance with the provi
sions of the Official Code of
Georgia Annotated, the Plain
tiff-Condemnor has prayed the
Court for Immediate posses
sion of said property, and all
persons having any interest in
or claim against such property,
as above set forth, are required
by the Order of the Judge of
said Court to surrender pos
session of the property to the
Department of Transportation
no later than 30 days from filing
of the Declaration of Taking.
That in accordance with the
Official Code of Georgia Anno
tated Section 32-3-13 through
32-3-19, if the owner, or any of
the owners, or any person hav
ing a claim against or interest in
said property, shall be dissatis
fied with the compensation, as
estimated in the Declaration of
Taking and deposited in Court,
such person or persons, or any
of them, shall have the right,
at any time subsequent to the
filing of the Declaration and
the deposit of the fund into
Court but not later than 30 days
following the date of service
as provided for in the Official
Code of Georgia Annotated
Sections 32-3-8 through 32-3-
10 to file with the Court a notice
of appeal, the same to be in
writing and made a part of the
record in the proceedings.
The said property, as thus
affected, is described
as follows:
SEE PAGE 20-A; 20-B; FOR
DESCRIPTION
This 2 day of April, 2018.
Lois Riner
Chief Deputy Clerk Superior
Court
BARROW COUNTY
Project Number: CSSTP-
0006-00(327), P.l. 0006327
BARROW COUNTY
Parcel Numbers: 48
Required R/W: 0.449 acres
of land; and certain easement
rights
Property Owner:
Pierce Hardy Limited Part
nership, a Pennsylvania limited
partnership
All that tract or parcel of land
lying and being in 243rd Geor
gia Militia District in Barrow
County, Georgia, being more
particularly described as fol
lows:
BEGINNING at the point
of intersection on the west
ern property line of the con
demnees with the existing
southern right of way line of
BANKHEAD HWY, said point
being 30.49 feet right of and
opposite station 500+74.18
on the construction centerline
laid out for BANKHEAD HWY
on Georgia Highway Project
CSSTP-0006-00(327), P.l.
0006327; running thence N
89°56’36.1” E a distance of
595.66 feet to a point 31.56
feet right of and opposite sta
tion 506+70.09 on said con
struction centerline laid out
for BANKHEAD HWY; thence
S 0° 11’02.2” W a distance of
27.84 feet to a point 59.40
feet right of and opposite sta
tion 506+70.10 on said con
struction centerline laid out for
BANKHEAD HWY; thence S
88°47’29.9” W a distance of
565.73 feet to a point 69.80
feet right of and opposite sta
tion 501+03.96 on said con
struction centerline laid out for
BANKHEAD HWY; thence N
37°24’20.9” W a distance of
49.32 feet back to the point of
BEGINNING. Said described
land being the required right of
way and as shown described
within on the attached plats
marked Annex 1-A.
BEGINNING at a point on
the western property line of the
condemnees, said point being
69.80 feet right of and oppo
site station 501+03.96 on the
construction centerline laid out
for BANKHEAD HWY on Geor
gia Highway Project CSSTP-
0006-00(327), P.l. 0006327;
running thence N 88°47’29.9”
E a distance of 254.07 feet to
a point 65.57 feet right of and
opposite station 503+58.00 on
said construction centerline
laid out for BANKHEAD HWY;
thence S 66°40’34.6” W a dis
tance of 59.78 feet to a point
89.00 feet right of and oppo
site station 503+03.00 on said
construction centerline laid out
for BANKHEAD HWY; thence
S 88°44’34.7” W a distance of
182.11 feet to a point 92.18
feet right of and opposite sta
tion 501+20.92 on said con
struction centerline laid out for
BANKHEAD HWY; thence N
37°24’20.9” W a distance of
28.08 feet back to the point of
BEGINNING. Said described
land being temporary easement
for the construction of staging
and as shown described within
on the attached plats marked
Annex 1-A.
The title, estate or inter
est in the above described
lands, required by condem
nor and now taken by con
demnor for public use is as
follows: Fee simple title to
the above described lands as
shown described within on the
plats dated the 7th day of April,
2016; Last Revised: Sheet
No. 8 on January 31,2017 and
attached to Appendix “A” to
Exhibit “A” as Annex 1-A.
A temporary easement is
condemned for the construc
tion of staging to connect the
newly constructed road and
right of way to the condemnee’s
remaining land. The easement
will expire on January 1, 2020
and as shown described within
on the attached plats marked
Annex 1-A. Upon completion
of the project, the condemnees
shall have the right to use the
easement area in accordance
with the applicable zoning
restrictions, and the condem
nor will cease maintenance of
the easement area.
(AP25, MY2P2) \
Citation
In the Superior Court
of Barrow County,
Georgia
DOCKET NO. 18CV-543-B
DEPARTMENT OF TRANS
PORTATION
VS.
0.236 acres of land; and
certain easement rights; and
Lynn Chang; Barrow County
Tax Commissioner; Jackson
Electric Membership Corpora
tion; First Family Financial Ser
vices of Georgia, Inc.; and any
and all others having or claim
ing any interest in the herein
described lands, individually.
The said named persons
and any and all other persons
known and unknown claiming
any right, title, power, inter
est, ownership, equity, claim
or demand in and to the lands
hereinafter described, and all
occupants, tenants, lessees,
licensees and all holders, own
ers and users of ways and
easements in, across, over
and under said land are hereby
notified, under the provisions
of the Official Code of Geor
gia Annotated Sections 32-3-4
through 32-3-19, providing for
the exercise of the power of
eminent domain by the State of
Georgia, or any of its subdivi
sions, or by any county of such
State, as follows:
That the above stated
case being a condemnation
in rem against the hereinafter
described, was filed in said
Court on the 11th day of 2018 ;
That, in accordance with provi
sions of the aforesaid official
code, a Declaration of Taking,
duly authorized and properly
executed as provided by the
Official Code, has been made
and filed in said case, declaring
the necessity for and exercising
the power of taking the said
described lands for State-aid
public road purposes, thereby
vesting the title to same in
the Department of Transpor
tation; and, in pursuance of
such authority, the Depart
ment of Transportation has
deposited with the Clerk of the
Superior Court of said County
$30,100.00 as the just com
pensation for the said lands
described; and all persons
claiming such fund or any inter
est therein, are hereby required
to make known their claims to
the Court;
In accordance with the provi
sions of the Official Code of
Georgia Annotated, the Plain
tiff-Condemnor has prayed the
Court for immediate posses
sion of said property, and all
persons having any interest in
or claim against such property,
as above set forth, are required
by the Order of the Judge of
said Court to surrender pos
session of the property to the
Department of Transportation
no later than 30 days from filing
of the Declaration of Taking.
That in accordance with the
Official Code of Georgia Anno
tated Section 32-3-13 through
32-3-19, if the owner, or any of
the owners, or any person hav
ing a claim against or interest in
said property, shall be dissatis
fied with the compensation, as
estimated in the Declaration of
Taking and deposited in Court,
such person or persons, or any
of them, shall have the right,
at any time subsequent to the
filing of the Declaration and
the deposit of the fund into
Court but not later than 30 days
following the date of service
as provided for in the Official
Code of Georgia Annotated
Sections 32-3-8 through 32-3-
10 to file with the Court a notice
of appeal, the same to be in
writing and made a part of the
record in the proceedings.
The said property, as thus
affected, is described as fol
lows:
Project Number:
BRSTO-052-01 (015)
P.l. 132981 BARROW
COUNTY
Parcel Number: 13
Required R/W: 0.236 acres
of land; and certain easement
rights
Property Owner: Lynn
Chang; Barrow County Tax
Commissioner; Jackson Elec
tric Membership Corporation;
Barrow County Probate Court;
First Family Financial Services
of Georgia, Inc. and any and all
others having or claiming any
interest in the herein described
lands:
Beginning at a point 40.99
feet right of and opposite
Station 302+94.49 on the
construction centerline of Tan
ners Bridge Road on Georgia
Highway Project No. BRSTO-
0050-01(015); running thence
S 77°19’52.5” E a distance of
188.87 feet to a point 39.50
feet right of and opposite sta
tion 304+84.25 on said con
struction centerline laid out
for C/L Tanner’s Bridge Road;
thence S 43°42’21.5” E a dis
tance of 27.19 feet to a point
53.98 feet right of and oppo
site station 305+07.41 on said
construction centerline laid out
for C/L Tanner’s Bridge Road;
thence southwesterly 36.03
feet along the arc of a curve
(said curve having a radius
of 2185.00 feet and a chord
distance of 36.03 feet on a
bearing of S 15°16’34.5” W) to
the point 90.00 feet right of and
opposite station 305+06.73 on
said construction centerline
laid out for C/L Tanner’s Bridge
Road; thence N 75°48’27.5”
W a distance of 5.41 feet to
a point 90.00 feet right of and
opposite station 305+01.32 on
said construction centerline
laid out for C/L Tanner’s Bridge
Road; thence northwesterly
131.45 feet along the arc of
a curve (said curve having a
radius of 5140.00 feet and a
chord distance of 131.44 feet
on a bearing of N 76°32’24.9”
W) to the point 90.00 feet
right of and opposite station
303+67.57 on said construc
tion centerline laid out for C/L
Tanner’s Bridge Road; thence
N 77°16’22.4” W a distance of
73.20 feet to a point 90.00 feet
right of and opposite station
302+94.36 on said construc
tion centerline laid out for C/L
continued on following page