Newspaper Page Text
WEDNESDAY, MAY 2, 2018
BARROW NEWS-JOURNAL
PAGE 7C-W
Public Notices Continued
for MAINLINE WWBP; thence
N 36°05’17.8” W a distance of
339.36 feet to a point 154.95
feet left of and opposite station
246+04.17 on said construction
centerline laid out for MAINLINE
WWBP; thence N 43°19’03.5” E
a distance of 18.80 feet to a point
146.24 feet left of and oppo
site station 246+20.83 on said
construction centerline laid out
for MAINLINE WWBP; thence
N 43°19’03.5” E a distance of
200.01 feet to a point 62.85
feet left of and opposite station
425+10.21 on said construc
tion centerline laid out for MAT
THEWS SCHOOL RD; thence
S 44°22’02.9” E a distance of
400.00 feet to a point 22.28
feet right of and opposite sta
tion 429+01.80 on said construc
tion centerline laid out for MAT
THEWS SCHOOL RD; thence
S 43°54’03.7” W a distance of
276.09 feet back to the point
of BEGINNING. Said described
land being the required right of
way and is for the total acquisi
tion of said parcel and as shown
described within on the attached
plats marked Annex 1-A.
The title, estate or interest
in the above described land
required by condemnor and now
taken by condemnor for public
use is as follows: Fee simple
title to the above described land
as shown described within on
the plats dated the 7th day of
April, 2016; Last Revised: Sheet
Nos. 6, 7 and 35 on January 12,
2018 and attached to Appendix
“A” to Exhibit “A” as Annex 1-A.
(AP25, MY2P2) \
Citation
In the Superior Court
of Barrow County
Georgia
DOCKET NO. 18CV-471-B
IN REM
DEPARTMENT OF TRANS
PORTATION
VS.
3.966 acres of land; certain
easement rights; and certain
access rights; and Pierce Hardy
Limited Partnership, a Pennsyl
vania limited partnership, indi
vidually
The said named persons and
any and all other persons known
and unknown claiming any right,
title, power, interest, ownership,
equity, claim or demand in and to
the lands hereinafter described,
and all occupants, tenants, les
sees, licensees and all holders,
owners and users of ways and
easements in, across, over and
under said land are hereby noti
fied, under the provisions of the
Official Code of Georgia Anno
tated Sections 32-3-4 through
32-3-19, providing for the exer
cise of the power of eminent
domain by the State of Georgia,
or any of its subdivisions, or by
any county of such State, as
follows:
That the above stated case,
being a condemnation in rem
against the property hereinafter
described, was filed in said Court
on the 2 day of April, 2018; That,
in accordance with provisions
of the aforesaid Official Code,
a Declaration of Taking, duly
authorized and properly execut
ed as provided by the Official
Code, has been made and filed
in said case, declaring the neces
sity for and exercising the power
of taking the said described
lands for State-aid public road
purposes, thereby vesting the
title to same in the Department
of Transportation; and, in pur
suance of such authority, the
Department of Transportation
has deposited with the Clerk
of the Superior Court of said
County $619,700.00 as the just
compensation for the said lands
described; and all persons claim
ing such fund or any interest
therein, are hereby required to
make known their claims to the
Court;
In accordance with the provi
sions of the Official Code of
Georgia Annotated, the Plain
tiff-Condemnor has prayed the
Court for Immediate possession
of said property, and all persons
having any interest in or claim
against such property, as above
set forth, are required by the
Order of the Judge of said Court
to surrender possession of the
property to the Department of
Transportation no later than 30
days from filing of the Declara
tion of Taking.
That in accordance with the
Official Code of Georgia Anno
tated Section 32-3-13 through
32-3-19, if the owner, or any of
the owners, or any person hav
ing a claim against or interest in
said property, shall be dissatis
fied with the compensation, as
estimated in the Declaration of
Taking and deposited in Court,
such person or persons, or any
of them, shall have the right,
at any time subsequent to the
filing of the Declaration and the
deposit of the fund into Court
but not later than 30 days fol
lowing the date of service as
provided for in the Official Code
of Georgia Annotated Sections
32-3-8 through 32-3-10 to file
with the Court a notice of appeal,
the same to be in writing and
made a part of the record in the
proceedings.
The said property, as thus
affected, is described
as follows:
SEE PAGE 20-A; 20-B;
20-C; 20-D; 20-E; 20-F; FOR
DESCRIPTION
This 2 day of April, 2018.
Lois Riner
Chief Deputy Clerk Superior
Court
BARROW COUNTY
Project Number: CSSTP-
0006-00(327), PI. 0006327
BARROW COUNTY
Parcel Numbers: 14
Required R/W: 3.966 acres
of land; certain easement rights;
and 807.81 linear feet of
access rights
Property Owner: Pierce Hardy
Limited Partnership, a Pennsyl
vania limited partnership
All those tracts or parcel of
land lying and being in 243rd
Georgia Militia District in Barrow
County, Georgia, being more
particularly described as follows:
Tract 1
BEGINNING at the point of
intersection between the south
western property line of the
condemnees with the exist
ing northern right of way line
of BANKHEAD HWY, said point
being 28.32 feet left of and
opposite station 500+29.59 on
the construction centerline of
MAINLINE WWBP on Georgia
Highway Project No. CSSTP-
0006-00(327), PI. 0006327; run
ning thence N 37°32’56.6” W a
distance of 335.19 feet to a point
40.92 feet right of and oppo
site station 264+91.13 on said
construction centerline laid out
for MAINLINE WWBP; thence
S 89°36’33.1” W a distance of
262.89 feet to a point 211.66
feet left of and opposite station
264+18.22 on said construction
centerline laid out for MAINLINE
WWBP; thence N 37°22’59.9” W
a distance of 33.92 feet to a point
238.78 feet left of and oppo
site station 264+38.59 on said
construction centerline laid out
for MAINLINE WWBP; thence N
79°00’41.0” E a distance of 6.74
feet to a point 232.77 feet left of
and opposite station 264+41.62
on said construction centerline
laid out for MAINLINE WWBP;
thence N 69°46’47.5” E a dis
tance of 18.89 feet to a point
217.47 feet left of and oppo
site station 264+52.70 on said
construction centerline laid out
for MAINLINE WWBP; thence
N 82°11’53.0” E a distance of
25.57 feet to a point 194.03
feet left of and opposite station
264+62.90 on said construction
centerline laid out for MAINLINE
WWBP; thence N 36°24’54.0” E
a distance of 21.62 feet to a point
186.39 feet left of and oppo
site station 264+83.12 on said
construction centerline laid out
for MAINLINE WWBP; thence
N 57°13’08.9” E a distance of
25.04 feet to a point 169.79
feet left of and opposite station
265+01.87 on said construction
centerline laid out for MAINLINE
WWBP; thence N 18°46’34.6” W
a distance of 16.19 feet to a point
178.96 feet left of and oppo
site station 265+15.22 on said
construction centerline laid out
for MAINLINE WWBP; thence
N 56°46’09.4” W a distance of
16.26 feet to a point 194.46
feet left of and opposite station
265+20.11 on said construction
centerline laid out for MAINLINE
WWBP; thence S 89°54’24.9” W
a distance of 16.05 feet to a point
209.90 feet left of and oppo
site station 265+15.74 on said
construction centerline laid out
for MAINLINE WWBP; thence
N 9°27’12.6” W a distance of
22.42 feet to a point 219.44
feet left of and opposite station
265+36.03 on said construction
centerline laid out for MAINLINE
WWBP; thence N 55°31’54.5” E
a distance of 17.29 feet to a point
208.37 feet left of and oppo
site station 265+49.31 on said
construction centerline laid out
for MAINLINE WWBP; thence
N 67°37’59.4” E a distance of
46.37 feet to a point 171.86
feet left of and opposite station
265+77.91 on said construction
centerline laid out for MAINLINE
WWBP; thence N 37°06’20.4” E
a distance of 30.17 feet to a point
160.86 feet left of and oppo
site station 266+06.00 on said
construction centerline laid out
for MAINLINE WWBP; thence
N 36°42’18.1” E a distance of
28.33 feet to a point 150.71
feet left of and opposite station
266+32.45 on said construction
centerline laid out for MAINLINE
WWBP; thence N 31°20’34.9”
E a distance of 309.00 feet to a
point 80.42 feet left of and oppo
site station 269+16.39 on said
construction centerline laid out
for MAINLINE WWBP; thence
N 52°17’53.5” E a distance of
174.75 feet to a point 19.49
feet left of and opposite station
270+70.08 on said construction
centerline laid out for MAINLINE
WWBP; thence S 36°53’54.5”
E a distance of 136.54 feet to
a point 111.35 feet right of and
opposite station 270+28.19 on
said construction centerline
laid out for MAINLINE WWBP;
thence southwesterly 122.03
feet along the arc of a curve
(said curve having a radius of
269.79 feet and a chord distance
of 120.99 feet on a bearing of S
32°39’01.1” W) to a point 104.00
feet right of and opposite station
268+86.30 on said construction
centerline laid out for MAINLINE
WWBP; thence S 14°24’21.2”
W a distance of 221.74 feet
to a point 115.00 feet right of
and opposite station 266+50.00
on said construction centerline
laid out for MAINLINE WWBP;
thence S 2°16’46.9” E a distance
of 145.70 feet to a point 160.00
feet right of and opposite station
265+11.42 on said construction
centerline laid out for MAINLINE
WWBP; thence S 35°03’33.2”
E a distance of 168.95 feet to
a point 143.00 feet left of and
opposite station 500+43.00 on
said construction centerline laid
out for BANKHEAD HWY; thence
S 6°24’53.2” W a distance of
115.47 feet back to the point
of BEGINNING. Said described
land being the required right of
way and as shown described
within on the attached plats
marked Annex 1-A.
Tract 2
BEGINNING at a point on the
existing northern right of way
line of BANKHEAD HWY, said
point being 28.29 feet left of
and opposite station 502+19.00
on the construction centerline of
BANKHEAD HWY on Georgia
Highway Project No. CSSTP-
0006-00(327), PI. 0006327;
running thence N 0°15’15.3” W
a distance of 26.71 feet to a
point 55.00 feet left of and oppo
site station 502+19.00 on said
construction centerline laid out
for BANKHEAD HWY; thence
N 89°38’50.5” E a distance of
373.45 feet to a point 56.00
feet left of and opposite sta
tion 505+92.00 on said con
struction centerline laid out for
BANKHEAD HWY; thence N
51 °57’07.8” E a distance of 98.90
feet to a point 62.79 feet left of
and opposite station 579+13.00
on said construction centerline
laid out for BANKHEAD HWY;
thence S 0°06’24.9” W a dis
tance of 88.02 feet to a point
29.22 feet left of and oppo
site station 506+69.82 on said
construction centerline laid out
for BANKHEAD HWY; thence
S 89°45’10.5” W a distance of
451.05 feet back to the point
of BEGINNING. Said described
land being the required right of
way and as shown described
within on the attached plats
marked Annex 1-A.
Permanent Easement
BEGINNING at a point on the
existing northern right of way
line of BANKHEAD HWY, said
point being 28.32 feet left of
and opposite station 500+29.59
on the construction centerline of
BANKHEAD HWY on Georgia
Highway Project No. CSSTP-
0006-00(327), PI. 0006327;
running thence N 6°24’53.2” E
a distance of 3.71 feet to a
point 32.00 feet left of and oppo
site station 500+30.02 on said
construction centerline laid out
for BANKHEAD HWY; thence
N 86°31’14.7” E a distance of
142.20 feet to a point 40.00
feet left of and opposite sta
tion 501+72.00 on said con
struction centerline laid out
for BANKHEAD HWY; thence
N 72°02’43.1” E a distance
of 49.34 feet to a point 55.00
feet left of and opposite sta
tion 502+19.00 on said con
struction centerline laid out for
BANKHEAD HWY; thence S
0°15’15.3” E a distance of 26.71
feet to a point 28.29 feet left of
and opposite station 502+19.00
on said construction centerline
laid out for BANKHEAD HWY;
thence S 89°45’10.5” W a dis
tance of 189.41 feet back to
the point of BEGINNING. Said
described land being a perma
nent easement for the construc
tion of slopes and as shown
described within on the attached
plats marked Annex 1-A.
Driveway
BEGINNING at a point 55.33
feet left of and opposite sta
tion 504+05.00 on the construc
tion centerline of BANKHEAD
HWY on Georgia Highway Proj
ect No. CSSTP-0006-00(327),
PI. 0006327; running thence N
0°15’15.3” W a distance of 9.99
feet to a point 65.32 feet left of
and opposite station 504+05.00
on said construction centerline
laid out for BANKHEAD HWY;
thence N 89°38’50.5” E a dis
tance of 65.00 feet to a point
65.43 feet left of and opposite
station 504+70.00 on said con
struction centerline laid out for
BANKHEAD HWY; thence S
0°15’15.0” E a distance of 9.99
feet to a point 55.44 feet left of
and opposite station 504+70.00
on said construction centerline
laid out for BANKHEAD HWY;
thence S 89°38’50.5” W a dis
tance of 65.00 feet back to the
point of BEGINNING. Said
described land being a tempo
rary easement for the construc
tion of a driveway and as shown
described within on the attached
plats marked Annex 1-A.
Also to be acquired is 807.81
linear feet of access rights
described as follows:
Limited Access 1
BEGINNING at a point on the
existing northern right of way
line of BANKHEAD HWY, said
point being 28.32 feet left of
and opposite station 500+29.59
on the construction centerline of
BANKHEAD HWY on Georgia
Highway Project No. CSSTP-
0006-00(327), PI. 0006327; run
ning thence N 6°24’53.2” E a
distance of 115.47 feet to a point
143.00 feet left of and oppo
site station 500+43.00 on said
construction centerline laid out
for BANKHEAD HWY; thence
N 35°03’33.2” W a distance of
168.95 feet to a point 160.00
feet right of and opposite station
265+11.42 on said construction
centerline laid out for MAINLINE
WWBP; thence N 2°16’46.9”
W a distance of 145.70 feet
to a point 115.00 feet right of
and opposite station 266+50.00
on said construction centerline
laid out for MAINLINE WWBP;
thence N 14°24’21.2” E a dis
tance of 221.74 feet ending at
a point 104.00 feet right of and
opposite station 268+86.30 on
said construction centerline laid
out for MAINLINE WWBP.
Limited Access 2
BEGINNING at a point on
the southwestern property line
of the condemnees, said point
being 211.66 feet left of and
opposite station 264+18.22 on
the construction centerline of
MAINLINE WWBP on Georgia
Highway Project No. CSSTP-
0006-00(327), PI. 0006327; run
ning thence N 37°22’59.9” W a
distance of 33.92 feet ending
at a point 238.78 feet left of
and opposite station 264+38.59
on said construction centerline
laid out for MAINLINE WWBP.
Said descriptions are for the total
acquisition of 807.81 linear feet
of access rights and as shown
described within on the attached
plats marked Annex 1-A.
The title, estate or interest
in the above described lands,
required by condemnor and now
taken by condemnor for public
use as rights of way for a LIM
ITED ACCESS HIGHWAY as
defined under the Official Code
of Georgia Annotated sections
32-6-110 through 32-6-119 is as
follows: Fee simple title to the
above described access rights
all as shown described within
on the attached plats marked
Annex 1-A. Said access rights
being required between the con
demnees remaining real prop
erty and existing roads, streets
or highways, intersecting or adja
cent to the LIMITED ACCESS
HIGHWAY, such access rights
being specifically delineated on
Department of Transportation
plats dated the 7th day of April,
2016; Last Revised: Sheet Nos.
10, 11 and 38 on February 13,
2018, and Sheet No. 8 on July
31,2017 and attached to Appen
dix “A” to Exhibit “A” Annex 1-A.
A permanent easement is
condemned for the right to con
struct and maintain slopes to
connect the newly constructed
road and right of way to the
condemnees remaining lands
and as shown described within
on the attached plats marked
Annex 1-A.
A temporary easement is con
demned for the right to construct
a driveway to connect the newly
constructed road and right of
way to the condemnees remain
ing lands for driveway purposes.
Said easement will expire on
January 1, 2020 and as shown
described within on the attached
plats marked Annex 1-A. pon
completion of the project, the
driveway will remain in place for
use by the condemnees.
(AP25, MY2P2) \
Citation
In the Superior Court
of Barrow County
Georgia
DOCKET NO. 18CV-472-B
IN REM
DEPARTMENT OF TRANS
PORTATION
VS.
0.449 acres of land; and cer
tain easement rights; and
Pierce Hardy Limited Partner
ship, a Pennsylvania limited part
nership, individually
The said named persons and
any and all other persons known
and unknown claiming any right,
title, power, interest, ownership,
equity, claim or demand in and to
the lands hereinafter described,
and all occupants, tenants, les
sees, licensees and all holders,
owners and users of ways and
easements in, across, over and
under said land are hereby noti
fied, under the provisions of the
Official Code of Georgia Anno
tated Sections 32-3-4 through
32-3-19, providing for the exer
cise of the power of eminent
domain by the State of Georgia,
or any of its subdivisions, or by
any county of such State, as
follows:
That the above stated case,
being a condemnation in rem
against the property hereinafter
described, was filed in said Court
on the 2 day of April, 2018; That,
in accordance with provisions of
the aforesaid Official Code, a
Declaration of Taking, duly autho
rized and properly executed as
provided by the Official Code,
has been made and filed in said
case, declaring the necessity for
and exercising the power of tak
ing the said described lands for
State-aid public road purposes,
thereby vesting the title to same
in the Department of Trans
portation; and, in pursuance of
such authority, the Department
of Transportation has deposited
with the Clerk of the Superior
Court of said County $4,120.00
as the just compensation for the
said lands described; and all
persons claiming such fund or
any interest therein, are hereby
required to make known their
claims to the Court;
In accordance with the provi
sions of the Official Code of
Georgia Annotated, the Plain
tiff-Condemnor has prayed the
Court for Immediate possession
of said property, and all persons
having any interest in or claim
against such property, as above
set forth, are required by the
Order of the Judge of said Court
to surrender possession of the
property to the Department of
Transportation no later than 30
days from filing of the Declara
tion of Taking.
That in accordance with the
Official Code of Georgia Anno
tated Section 32-3-13 through
32-3-19, if the owner, or any of
the owners, or any person hav
ing a claim against or interest in
said property, shall be dissatis
fied with the compensation, as
estimated in the Declaration of
Taking and deposited in Court,
such person or persons, or any
of them, shall have the right,
at any time subsequent to the
filing of the Declaration and the
deposit of the fund into Court
but not later than 30 days fol
lowing the date of service as
provided for in the Official Code
of Georgia Annotated Sections
32-3-8 through 32-3-10 to file
with the Court a notice of appeal,
the same to be in writing and
made a part of the record in the
proceedings.
The said property, as thus
affected, is described
as follows:
SEE PAGE 20-A; 20-B; FOR
DESCRIPTION
This 2 day of April, 2018.
Lois Riner
Chief Deputy Clerk Superior
Court
BARROW COUNTY
Project Number: CSSTP-
0006-00(327), PI. 0006327
BARROW COUNTY
Parcel Numbers: 48
Required R/W: 0.449 acres
of land; and certain easement
rights
Property Owner:
Pierce Hardy Limited Part
nership, a Pennsylvania limited
partnership
All that tract or parcel of land
lying and being in 243rd Georgia
Militia District in Barrow County,
Georgia, being more particularly
described as follows:
BEGINNING at the point
of intersection on the western
property line of the condemnees
with the existing southern right
of way line of BANKHEAD
HWY, said point being 30.49
feet right of and opposite sta
tion 500+74.18 on the con
struction centerline laid out for
BANKHEAD HWY on Georgia
Highway Project CSSTP-0006-
00(327), PI. 0006327; running
thence N 89°56’36.1” E a dis
tance of 595.66 feet to a point
31.56 feet right of and oppo
site station 506+70.09 on said
construction centerline laid out
for BANKHEAD HWY; thence S
0°11’02.2” W a distance of 27.84
feet to a point 59.40 feet right of
and opposite station 506+70.10
on said construction centerline
laid out for BANKHEAD HWY;
thence S 88°47’29.9” W a dis
tance of 565.73 feet to a point
69.80 feet right of and oppo
site station 501+03.96 on said
construction centerline laid out
for BANKHEAD HWY; thence
N 37°24’20.9” W a distance of
49.32 feet back to the point of
BEGINNING. Said described
land being the required right of
way and as shown described
within on the attached plats
marked Annex 1-A.
BEGINNING at a point on
the western property line of the
condemnees, said point being
69.80 feet right of and opposite
station 501+03.96 on the con
struction centerline laid out for
BANKHEAD HWY on Georgia
Highway Project CSSTP-0006-
00(327), PI. 0006327; running
thence N 88°47’29.9” E a dis
tance of 254.07 feet to a point
65.57 feet right of and oppo
site station 503+58.00 on said
construction centerline laid out
for BANKHEAD HWY; thence S
66°40’34.6” W a distance of 59.78
feet to a point 89.00 feet right of
and opposite station 503+03.00
on said construction centerline
laid out for BANKHEAD HWY;
thence S 88°44’34.7” W a dis
tance of 182.11 feet to a point
92.18 feet right of and oppo
site station 501+20.92 on said
construction centerline laid out
for BANKHEAD HWY; thence
N 37°24’20.9” W a distance of
28.08 feet back to the point of
BEGINNING. Said described
land being temporary easement
for the construction of staging
and as shown described within
on the attached plats marked
Annex 1-A.
The title, estate or interest
in the above described lands,
required by condemnor and now
taken by condemnor for public
use is as follows: Fee simple
title to the above described lands
as shown described within on
the plats dated the 7th day of
April, 2016; Last Revised: Sheet
No. 8 on January 31, 2017 and
attached to Appendix “A” to
Exhibit “A” as Annex 1-A.
A temporary easement is con
demned for the construction of
staging to connect the newly
constructed road and right of
way to the condemnee’s remain
ing land. The easement will
expire on January 1, 2020 and
as shown described within on
the attached plats marked Annex
1-A. Upon completion of the
project, the condemnees shall
have the right to use the ease
ment area in accordance with
the applicable zoning restric
tions, and the condemnor will
cease maintenance of the ease
ment area.
(AP25, MY2P2) \
Citation
In the Superior Court
of Barrow County,
Georgia
DOCKET NO. 18CV-543-B
DEPARTMENT OF TRANS
PORTATION
VS.
0.236 acres of land; and cer
tain easement rights; and Lynn
Chang; Barrow County Tax
Commissioner; Jackson Electric
Membership Corporation; First
Family Financial Services of
Georgia, Inc.; and any and all
others having or claiming any
interest in the herein described
lands, individually.
The said named persons and
any and all other persons known
and unknown claiming any right,
title, power, interest, ownership,
equity, claim or demand in and to
the lands hereinafter described,
and all occupants, tenants, les
sees, licensees and all holders,
owners and users of ways and
easements in, across, over and
under said land are hereby noti
fied, under the provisions of the
Official Code of Georgia Anno
tated Sections 32-3-4 through
32-3-19, providing for the exer
cise of the power of eminent
domain by the State of Georgia,
or any of its subdivisions, or by
any county of such State, as
follows:
That the above stated
case being a condemnation
in rem against the hereinafter
described, was filed in said Court
on the 11th day of 2018 ; That,
in accordance with provisions of
the aforesaid official code, a Dec
laration of Taking, duly autho
rized and properly executed as
provided by the Official Code,
has been made and filed in said
case, declaring the necessity for
and exercising the power of tak
ing the said described lands for
State-aid public road purposes,
thereby vesting the title to same
in the Department of Trans
portation; and, in pursuance of
such authority, the Department
of Transportation has deposited
with the Clerk of the Superior
Court of said County $30,100.00
as the just compensation for the
said lands described; and all
persons claiming such fund or
any interest therein, are hereby
required to make known their
claims to the Court;
In accordance with the provi
sions of the Official Code of
Georgia Annotated, the Plain
tiff-Condemnor has prayed the
Court for immediate possession
of said property, and all persons
having any interest in or claim
against such property, as above
set forth, are required by the
Order of the Judge of said Court
to surrender possession of the
property to the Department of
Transportation no later than 30
days from filing of the Declara
tion of Taking.
That in accordance with the
Official Code of Georgia Anno
tated Section 32-3-13 through
32-3-19, if the owner, or any of
the owners, or any person hav
ing a claim against or interest in
said property, shall be dissatis
fied with the compensation, as
estimated in the Declaration of
Taking and deposited in Court,
such person or persons, or any
of them, shall have the right,
at any time subsequent to the
filing of the Declaration and the
deposit of the fund into Court
but not later than 30 days fol
lowing the date of service as
provided for in the Official Code
of Georgia Annotated Sections
32-3-8 through 32-3-10 to file
with the Court a notice of appeal,
the same to be in writing and
made a part of the record in the
proceedings.
The said property, as thus
affected, is described as follows:
Project Number:
BRSTO-052-01 (015)
PI. 132981 BARROW
COUNTY
Parcel Number: 13
Required R/W: 0.236 acres
of land; and certain easement
rights
Property Owner: Lynn Chang;
Barrow County Tax Commission
er; Jackson Electric Membership
Corporation; Barrow County Pro
bate Court; First Family Finan
cial Services of Georgia, Inc.
and any and all others having
or claiming any interest in the
herein described lands:
Beginning at a point 40.99
feet right of and opposite Station
302+94.49 on the construc
tion centerline of Tanners Bridge
Road on Georgia Highway Proj
ect No. BRSTO-0050-01(015);
running thence S 77°19’52.5”
E a distance of 188.87 feet to
a point 39.50 feet right of and
opposite station 304+84.25 on
said construction centerline
laid out for C/L Tanner’s Bridge
Road; thence S 43°42’21.5” E a
distance of 27.19 feet to a point
53.98 feet right of and oppo
site station 305+07.41 on said
construction centerline laid out
for C/L Tanner’s Bridge Road;
thence southwesterly 36.03 feet
along the arc of a curve (said
curve having a radius of 2185.00
feet and a chord distance of
36.03 feet on a bearing of S
15°16’34.5” W) to the point 90.00
feet right of and opposite station
305+06.73 on said construction
centerline laid out for C/L Tan
ner’s Bridge Road; thence N
75°48’27.5” W a distance of 5.41
feet to a point 90.00 feet right of
and opposite station 305+01.32
on said construction center-
line laid out for C/L Tanner’s
Bridge Road; thence northwest
erly 131.45 feet along the arc
of a curve (said curve having
a radius of 5140.00 feet and a
chord distance of 131.44 feet on
a bearing of N 76°32’24.9” W)
to the point 90.00 feet right of
and opposite station 303+67.57
on said construction centerline
laid out for C/L Tanner’s Bridge
Road; thence N 77°16’22.4” W a
distance of 73.20 feet to a point
90.00 feet right of and oppo
site station 302+94.36 on said
construction centerline laid out
for C/L Tanner’s Bridge Road;
thence N 12°52’14.9” E a dis
tance of 49.01 feet back to the
point of beginning. Containing
0.236 acres more or less.
Also to be acquired by con
demnation are two temporary
easements for the construction
of driveways being described as
follows:
Driveway Easement 1
BEGINNING at a point 90.00
feet right of and opposite sta
tion 303+48.00 on the construc
tion centerline laid out for Tan
ner’s Bridge Road on Georgia
Highway Project BRSTO-052-
01(015), P.l. 132981; running
thence S 77 degrees 16 min
utes 22.4 seconds E a distance
of 19.57 feet to a point 90.00
feet right of and opposite station
303+67.57 on said construction
centerline laid out for Tanner’s
Bridge Road; thence southeast
erly 23.03 feet along the arc
of a curve (said curve having
a radius of 5140.00 feet and a
chord distance of 23.03 feet on a
bearing of S 77 degrees 08 min
utes 40.3 seconds E) to a point
90.00 feet right of and opposite
station 303+91.00 on said con
struction centerline laid out for
Tanner’s Bridge Road; thence
S 12’ degrees 59 minutes 01.8
seconds W a distance of 7.00
feet to a point 97.00 feet right of
and opposite station 303+91.00
on said construction center-
line laid out for Tanner’s Bridge
Road; thence N 77 degrees 12
minutes 12.7 seconds W a dis
tance of 42.57 feet to a point
97.00 feet right of and opposite
station 303+48.00 on said con
struction centerline laid out for
Tanner’s Bridge Road; thence
N 12 degrees 43 minutes 37.6
seconds E a distance of 7.00
feet back to the point of BEGIN
NING. Said described land being
a temporary easement for the
construction of a driveway and
as shown described within on
the attached plats marked Annex
1-A.
Driveway Easement 2
BEGINNING at a point 90.00
feet right of and opposite sta
tion 304+14.00 on the construc
tion centerline laid out for Tan
ner’s Bridge Road on Georgia
Highway Project BRSTO-052-
01(015), P.l. 132981; running
thence southeasterly 27.52 feet
along the arc of a curve (said
curve having a radius of 5140.00
feet and a chord distance of
27.52 feet on a bearing of S 76
degrees 36 minutes 38.9 sec
onds E) to a point 90.00 feet
right of and opposite station
304+42.00 on said construc
tion centerline laid out for Tan
ner’s Bridge Road; thence S 13
degrees 32 minutes 33.2 sec
onds W a distance of 17.00 feet
to a point 107.00 feet right of and
opposite station 304+42.00 on
said construction centerline laid
out for Tanner’s Bridge Road;
thence N 76 degrees 36 minutes
continued on following page