NOTICK TO CONTRACTORS
FKDKKAI. All) SECONDARY PRO
JECT NO.'S 0862 (2) COUNTY OF
FORSYTH
Sealed proposals will be received
by the State Hlghwway Department
of Georgia at the General Office at
No. 2 Capitol Square, Atlanta, Ga.,
until 11 A. M. Eastern Standard
time, March 26, 1954, and publicly
opened for furbishing all labor, mat
erial, equipment and other things
necessary for the construction of
5.430 miles of grading and paving
and a bridge at Six Mile Creek lo
cated in Forsyth County on what is
locally known as the Coal Mountain
—Gainesville road, State Route 141.
Beginning at the intersection of
State Route 9 at Coal Mountain, ap
proximately 5 miles north of Cum
ming, and extending toward Gain
esville, otherwise known as Feder
al Aid Secondary Project S 0862 (2)
in Forsyth county. The work will
be let in one contract.
THE APPROXIMATE QUANTI
TIES FOR ROADWAY ARE AS
FOLLOWS:
82.498--Acres —Clearing & Grubbing
—Lump Sum
6.878-Acres Random Clearing &
Grubbing—Per Acre
336597—Cu. Yds.—Unci. Excavation
& Borrow, Incl. Ditches and Shoul
ders
350—Cu. Yds.—Channel Excavation
896429-Sta. Yds.—Overhaul on Ex
cavation
25337—Cu. Yds.—Subgrade Treat-
ment Material
136257—U. Yds. -Overhaul on Sub
grade Treatment Material
3510—Cu. Yds.—Excavation for Cul
verts & Minor Structures
332 —Cu. Yds. — Selected Material
Backfill, Culvert Foundation
214.98—Cu. Yds.— Class “A" Con
crete Culverts
56.88—Cu. Yds.—Class “B" Concrete
Headwalls
16722 —Lbs.—Bar Reinforcing Steel
578- Lin. Ft—ls” Pipe SD ,
290—Lin. Ft.—lß” Pipe SD
50— Lin. Ft.—24” Pipe SD c
60—Lin. Ft.—ls” Pipe CD
504 Lin. Ft.—lß” Pipe CD
75—Lin. Ft.—lß” Pipe Stub
239- Lin. Ft.—24” Pipe CD
197—Lin. Ft.—3o” Pipe CD
51— Lin. Ft.—s 4” Pipe CD
364 -Lin. Ft.—lß” 14 Gauge CM
Pipe CD
215 Lin. Ft —3O” 12 Gauge CM
Pipe CD
162—Lin. Ft.—3o” 8 Gauge CM Pipe
CD
103—Lin Ft.—36” 12 Gauge CM or
Extra Strength Concrete Pipe CD
353—Lin. Ft.—36” 8 Gauge CM Pipe
CD
259—Lin. Ft.—s 4” 8 Gauge CM Pipe
CD
3150 Lin. Ft.—Culvert Pipe Remov
ed, SD or CD
214—Lin. Ft.—Culvert Pipe Relaid,
SD or CD
LUMP SUM Remove Ex
isting Bridge, Sta. 47*10
7822—Ton—Stone Dumped Rip Rap
290.2—5 q. Yds.—Plain Sand Cement
Bag Rip Rap
CUMMING JEWELERS
» not
* Q LOCAL TRADEMARKS, Im.
—WE WILL PROVE IT NEXT WEEK—
LIGHTNING DOES NOT ZIGZAG
lightning curves, twists, meuidors and branches, but It does not turn in
acute angles or xigsag. In 1856 Janies Nasmyth, a Scottish engineer, call
. ed this fact to the attention of the British Association for the Advance
ment of Science, after observations over a period of years. 1. “Uncom
mon Knowledge" Geo. W. Stlmpson.
This is the place that suits you no matter what your taste may be
and suits your budget no matter what its sice may be.
CUMMING JEWELERS!!
=DI«MONDS -WATCHES -JEWELRY
GUARANTttD WATCH ftPA/RS 4<k.v 7948
<JFW<?24I7 CUMMING.GA.
117— Each —Concrete R|W Markers
89692 Sq. Yds.— Seeding Slopes,
Shoulders, & Side Drains
89692—5 q. Yds.—Mulching Slopes,
Shoulders, & Side Drains
2516—Sq. Yds.—Sod Ditch Checks
2.5—M. Gals.—Water for Grassing
0.21 —Tons—First Application Fer
tilizer
73 Lbs.—Second Application Fer
tilizer
1000—Lin. Ft.—6” Perforated Pipe
Underdrain
I—Each —Remove FAP Marker
I—Each--Rested FAP Marker
6—Each—Reflectorized Guide Mark
ers, Type 5
I—Each Drop Inlets, Concrete,
Std. 1019, or Brick, Std. 1019-A,
Type "A", H-4’ or Less
22398—Cu. Yds.—Graded Aggregate
Base
24368—Gals.—Cutback Asphalt
Prime
66445—5 q. Yds..—Single Surface
Treatment, Type 1
66445—5 q. Yds.—Liquid Seal
57276—5 q. Yds.—Finishing & Dress
ing
7710—Cu. Yd.—Selected Material for
Shoulders
860—Cu. Yd.—Selected Material for
Drives
17472—Unit Yd.—Overhaul on Select
ed Material
160—Lin. Ft.—Guard Rail
THE APPROXIMAtE QUANTI
TIES FOR THE BRIDGE ARE AS
FOLLOWS:
745—Cu. Yd.—Class “A” Concrete
858—Lin. Ft.—Concrete Handrail
142500 —Lb.—Bar Reinforcing Steel
LUMP SUM Structural Steel
2810—Lin. Ft.—Steel H Piling, 10”
at 42 Lb.
2—Each—Steel H Test Piles
542 —Cu. Yd.—Bridge Excavation
No. 1
3.415 —Acres—Clearing & Grubbing
—Lump Sum
8300—Ton—Stone Dumped Rip Rap
4200 Lb.—U-Type Shear Connect
ors
I—Each —Loading Test
Said work shall begin within ten
(10) days after formal execution of
contract §nd shall be completed
within 300 working days. When con
tract has been executed, written,
notice shall be given the Contractor,
at which time, and not before, work
may be started.
Contract executed pursuant to this
Notice is binding on the State High
way Department, as such. Said con
tract will not create liability, ex
pressed or implied, against the un
dersigned Chairman of the State
Highway Board, as an individual nor
against any employee of the State
Highway Department, in his or her
individual capacity.
The minimum wage to be paid un
der this contract shall be the
amounts set out in thd Labor Pro
visions included in the Proposal. The
attention of bidders is directed to
the Special Provisions covering em
ployment of labor, methods of con
struction, subletting or assigning the
contract and to the use of domestic
materials.
Plans and specifications are on
The Forsyth County Newt
file at the office of the undersigned
! at Atlanta, and at Gainesville, Geor
! gia, and at the office of the Board of
j County Commissioners of Forsyth
; County at Cumming Georgia, where
| they may be inspected free of charge
Copies of the plans may be obtained
upon payment in advance of the
sum of $25.00. Copies of the Gener
al Specifications may be obtained
upon payment in advance of the sum
of $3.00, which sums will not be re
funded.
Proposals must be submitted on
regular forms, which will be sup
plied by the undersigned, and may
be obtained by a payment, in ad
vance of $5.00 for each proposal is
sued. When the proposal is submit
ted, it must be accompanied by a
certified check, cashier’s check, ne
gotiable United States Bonds, or
other acceptable security in the
amount of $7500.00, and must be
plainly marked “Proposal for Road
Construction,’ County and Number,
and show the time of opening as ad
vertised. Check of the low bidder
will be cashed and all other checks
will be returned as soon as the con
tract is awarded, unless it is deemed
advisable by the State Highway De
partment to hold one or more
checks. If an unusual condition aris
es, the State Highway Department
reserves the right to cash all checks.
Bidders Bond will not be accepted.
Bond will be required of the suc
cessful bidder as required by law.
Contracts will not be awarded to
contractors who have not been plac
ed on the list of qualified Contract
ors prior to the date of award. No
proposal will be issued to any bidder
later than 9 A. M. Eastern Standard
Time of the date of opening bids.
All bids must show totals for each
item and total amount of bid. Right
is reserved in the undersigned to de
lay the award of the contract for a
period not to exceed thirty 30) days
from the date of opening bids, dur
ing which period bids shall remain
open and not subject to withdrawal.
Right is also reserved in the under
signed to reject any and all bids and
to waive all formalities.
Upon compliance with the require
ments of the Standard Specifications
Ninety (90) percent of the amount
of work done in any calendar month
wHI be paid for by the 25th. day of
the succeeding month, provided that
payrolls have been submitted as re
quired and the remainder within
thirty (30) days after the Final
Statement is approved by the Engi
neer.
New. roomier bodies!
New. rugged construction!
1
New Chevrolet Trucks...
Andean Motor Company
This the Bth day of March, 1954.
STATE HIGHWAY DEPARTMENT
OF GEORGIA. '
Jim L. Gill is, Sr. Chairman
PIANO FOB SALE
1954 Model Spinet Piano with Match
ing Bench—will sacrifice if sold at
once rather than slip back to the
factory. Terms to responsible party.
Write: Mr. Louis Dunn, 52 Pryor
Street, Atlanta, Ga.
do more work per day... more work per dollar!
You save extra trips. That’s be
cause of the extra load space you
get in the new Advance-Design
bodies. New pick-up bodies are
deeper, new stake and platform
bodies are wider and longer. Also,
they’re set lower for easier loading.
You save hours on the road.
Thanks to new high-compression
power, you can maintain faster
schedules without driving at higher
maximum speeds. Increased accel
eration and hill-climbing ability let
you save time where it counts.
You save time on deliveries.
With new truck Hydra-Malic trans
MOST TRUSTWORTHY TRUCKS ON ANY JOB! Chevrolet Advanc»-D*sign Trucla
w
IT’S NEW, IT S HERE
UUti'S If SHOPPING corn
UMi TNt cussmeoi
W *« •*
SOUTHERN BEIL TELEPHONE
mission, you save time at every
delivery stop. And you can forget
about clutching and shifting for
good! It's optional at extra cost on
Vi-, %- and 1-ton Chevrolet trucks.
You save on operating costs.
New power saves you money every
mile! The “Thriftmaster 235” en
gine, the “Loadmaster 235” and
the “Jobmaster 261” (optional on
. 2-ton models at extra cost) deliver
increased operating economy.
You save with lower upkeep,
too. Extra chassis strength saves
you money on maintenance. There
are heavier axle shafts in two-ton
Cumming, Georgia
TOWN HOUSE
Distinctive Buffet
110 F'orsyth St., N. W. Main 6383
ATLANTA 3, GEORGIA
Atlanta’s most distinctive Buffet
Serving Atlanta’s most dellcous food
“A Good Place To Meet Friends”
Thursday, March 18, 1954.
Edward H. Shannon
J OPTOMETRIST
FORSYTH CLINIC
FIRST ft THIRD WEDNESDAY
OF EACH MONTH
HOW TO RELIEVE SKIN ITCH.
It* 15 MINUTES,
• )’ not pleated, your 40c bark at any
true atoro. ITCH-ME-NOT hat mild
anesthetic to mio itch in minutes; has
k antiseptic action that
slojjjhs off outer skin to KILL GERMS
AND FUNGUS ON CONTACT. Fina for \
eczema, ringworm, foot Itch, other sur
face rashes. Today at
CUMMING DRUG STOKE
Use the
‘ytUOW PACB'
seemit
of your new Telephone Direc*
tory to find who buys, sells,
rents or repairs
The Yellow Pages list the names, ad
dresses and telephone numbers of business
subscribers, alphabetically arranged under
headings generally descriptive of their
business, profession, or the commodity or
service they sell.
Look First in the
Yellow Pages for:
• The nearest dealer
• A list of dealers
• A particular brand or product
• An authorized service
• A business where only the
address is known
• Whatever you need,
whenever you need it
AND TELEGRAPH COMPANY
models ... bigger clutches in light
and heavy-duty models ... stronger
frames in all models.
And your savings start the day
you buy. In fact, they start with
the low price you pay and con
tinue over the miles. Chevrolet is
America’s lowest-priced line of
trucks. It's also the truck that has
a traditionally higher trade-in
Come in and see all the
wonderful new things you
get in America’s number \ •<****.,
one truck. We’ll be glad
to give you all the money- 1 r
saving facts. I \ .j&SjgjJaip' )