Newspaper Page Text
gj .A «•••••"• ""
B _ .„■
two trips around the
world • • • every day!
YOU KEEP US MOVING to provide the kind
of electric service you want! Our trucks and autos
travel an average of 50,000 miles a day. That’s
equal to twice the distance around the earth. In a
single day our motor vehicles cover as many miles as
the Average motorist does in four or five years.
More than two thirds of our vehicles are trucks,
and; they account for 61 per cent of the miles we
’ travel. We have big tractor-trailers to transport heavy
equipment. Tough little Jeeps help our line patrolmen
on their rounds over rough terrain. We use trucks
to speed linemen, construction, workers, troublemen,
appliance repairmen and many other employes to
their jobs.
Our passenger cars are a familiar sight to you.
They take supervisory personnel, engineers and cus
tomer service men to their appointments.
Yes, you keep us moving to provide you with electric
service of the highest quality and greatest dependa
bility. Yet the cost of your electric service is among
the nation’s lowest.
|
versatile
electricity . . . your dependable servant
L^^loW-COSf
I __
Shop With
Daniel’®
Groceries
Choice Meats Vegetables
Fresh Fruits Frozen Foods
Mclntyre, Ga.
The Bulletin Irwinton, Georgia. Eriday March 19, 1954
Notice to Contractors
Federal Aid Secondary
Project No. S 0686 (6)
County of Wilkinson
Sealed proposals will be received by
the State Highway Department of Geo
rgia at the General Office at N<». 2 Cap
itol Square, Atlanta, Georgia, until 11
A.M. Eastern Standard time, March 26,
1954, and publicly opened for
furni-hing all lab<»r, material, equip,
ment and other th’ne's necessary for
the construction of 6.138 miles of grad
in” - and paving locat'd in Wi'kinson
. County on what is locally known as the
Nichnlsvil'e - Toomsbo r o road, FAS
Route 686. Beginning at the S n uih
City "Limits of Toomsboro and ex f end
ing toward Nickelsville, otherwise
kn' wn as Federal A’"’ «ecnn r i-”’- Proi
ect S 0686 (6) in Wilkinson County.
The work will be lot ^n one «ontract.
The Approximate Quantities
Are As Follows:
60 160 Acres Clearing & Grubbing
Lump Sum
3.250 Acres Random Clearing &
Grubbing - Per Acre
72984 Cu. Yds. Unclassified Fxca-
Vatinn & Borrow. Including
Ditches & Shoulders
2^o flu. Yds Channel Excavation
28888 Sta. Yds. Overhaul on Exca
vation
9375 Cu Yds. Su bora de Treatment
Material
86641 Unit Yds. Overhaul nn Sub
grade Treatment Material
360 Cu. Yds. Excavation for Cul
verts & Minor Structures
100 Cu, Yds. Selected Material Rack
fill Culvert Foundation
182.13 Cu. Yds. Class “A” Con
crete Culverts
50 14 Cu. Yds. Class “R” Concrete
Headwalls
16252 Lbs. Bar Reinforcing Steel
520 Lin Ft. 15” Pipe SD
280 Lin. Ft. 18” Pipe SD
70 Lin Ft. 15” Pipe CD
751 Tan. Ft. 18” Pine CD
302 Lin. Ft. 24’’ Pipe CD
163 Lin Ft. 30’’ Pipe CD
D 5 Liu Ft 36” Pine CD
100 Lin. Ft. 42” Pipe CD
399 Lin. Ft. Culvert Pine Removed
SD or CD
Lump Sum Remove Exiting
Bridge, Sta. 1094143
250 Sq Yds. Plain Sand Cement
Rag Rip Ran - Snillways
66.4 Sq. Yds. Plain Sand Cement
Rag Rin Rap - Fndwalls
71495 Sq. Yds. Sprigging Slopes &
Shoulder#
680 Sq. Yds. Loose Sod Rip Rap
for Side Drains
2^o Sq. Yds. Block Sod Spillway
17^7 Sq Yds. Sod Ditch Checks
741 M.Gnls. Water for Grassing
6.12 Tons First Application Fertilizer
2143 Lbs Second Application Fer
tilizer
2000 Lin. Ft. 6” Perforated Pipe
Underdrain
1 Each Remove F.A P. Marker
1 Each Reset F A P. Marker
28915 Cu. Yds. Class “A” Sand
Clay Rase
155193 Unit Yds. Overhaul on Rase
Material
24545 Gals. Cutback Asphalt Prime
66525 Sq. Yds. Single Surface
Treatment Type 1
66525 Sq. Yds. Liquid Seal
64828 Sq.^Yds. Finishing and
Dressing
Established 1X94
From proceeding column
Federal Aid Secondary
Project No. S 0686 (6)
Said work bhall,begin within ten (10)
days after formal execution of contract
and shall be completed within 160 work
ing days. When contract has been ex
ecut«-d, written notice shall be given
the Contractor, at which time, and not
before, work may be stated.
C ntract executed pursuant to this
Notice is binding on the State Highway
Department, as such. Said contract
will not create liability, expressed or
implied, against the undersigned Chair
man of the State Highway Board, as an
individual nor against any em
ployee of the State Highway Depart
ment, in his or her individual capacity.
The minimum wage io be paid under
this contract shall be the anr unb. set
out in th” labor provisions included in
the Proposal. The attention of bidders
is directed to the Special Pr visions
covering employment of labor, meth
ods of construction, subletting or as
signing the contract and to the use of
domestic materials.
Plans and specifications are on file
at the office of the undersigned at At
lanta, and at Augusta. Georgia, and at
th” office of the Board of County Com
missioners of Wilkinson County, at Ir
winton, Ge rgia, where they may be
inspected free of charge. Copies of the
plans may be obtained upon payment
in advance of the sum ol $ 1 3.00. Copies
of the General Specifications may be
Obtained upon payment in advance of
the sum of $3.00, which sums will not
be refunded.
Proposals must be submitted on
regular forms, which will be supplied
b\ the undersigned, and may be
obtained by a payment, in advance of
§5.00 for each proposal issued. When
the proposal is submitted, it must be
accompanied by a C”itified check,
cashier’s check, negotiable United
States Bonds, ’or other acceptable
security in tne amount of §1500.00 ,and
mu o tbe plainly marked “Proposal for
Road Construction,’’ County and
Number, and show the time of opening
as adver'ised. Check of the low bidder
will be cashed and all other checks will
be returned as soon as the contract is
award' d, unless it is deemed advisable
by the State Highway Department to
hold one or more checks If an
unusual condition arises, the State
Highway Department reserves the
right to cash all cheeks. Bidders Bond
will not be accepted. Bond will be
required of the successful bidder as
required by law.
C‘ ntracts will not be awarded to con
tractors who have not been placed on
the list of qualified contractors prior to
the date of award. No proposal will be
issued to any bidder later than 9 A.M.
Eastern Standard Time of the date of
opening bids.
All bids mnst show totals for each
item and total amount of bid Right is
reserved in the undersigned to delay
the award of ihe contract for a period
not to exceed thirty (30) days from the
date of opening bids, during which
period bids shall remain open and not
subject to withdrawal. Right is also
reserved in the undersigned to reject
any and all bids and to waive all form
alities.
Upon compliance wFhthe require
ments of the Standard Specifications,
Ninety (90) percent of the amount of
worK done in any calendar month will
be paid for by the 25th. day of the suc
ceeding month, provided that payrolls
have b”en submitted as required and
the remainder within thirty (30) days
after the Final Statement is approved
by the Engineer.
This the Bth day df March 1954.
STATE HIGHWAY DEPARTMENT
OF GEORGIA
Jim L. Gillis, Sr. Chairman