NOTICK TO CONTRACTORS
FEDERAL AID SECONDARY
PRCMEf'T NO. S 0862 (8)
COUNTIES OF FORSYTH A’ HALL
Scaled proposals will bo received
by the Stale Highway Department
of Georgia at the General Office
at No. 2 Capitol Square, Atlanta,
Ga., until 11 A. M., Eastern Stand
ard time, August 19, 1955, and
publicly opened for furnishing all
labor, material, equipment and
other things necessary for the con
struction of 4.615 miles of grading
and paving and one bridge located
in Forsyth & Hall Counties on
what is locally known as the Coal
Mountain Gainesville road, State
Route 141 Beginning at the end of
the present contract approximately
5.5 miles east of State Route 9
and extending east toward Gaines
ville to the end of the present
pavement, otherwise known as Fed
eral Aid Secondary Project S 0862
(3) in Forsyth & Hall Counties.
The work will be let in one con
tract.
THE APPROXIMATE QUANTI
TIES FOR ROADWAY ARE AS
FOLLOWS:
26.995 Acres Clearing & Grubbing
- ILump Sum
33.500 Acres Random Clearing &
Grubbing—Per Acre
100570 Cu. Yds.—Unclass. Excav.
& Borrow, Inel. Ditches & Shoul
ders, Undercutting Subgrade, &
Incl. Material
2.478 Miles Grading per Mile
195376 Sta. Yds. Overhaul on Ex
cavation
13487 Cu. Yds.—Subgrade Treat
ment Material, Including Mater
ial
72644 Unit Yds. Overhaul on Sub
grade Treatment Material
4.615 Miles Special Subgrade Com
paction
590 Cu. Yds.—Excavation for Cul
verts & Minor Structures
600 Cu. Yds.— Selected Material
Backfill, Culvert Foundation
133.72 Cu. Yds.—Class "A” Con
crete Culverts
24.28 Cu. Yds.—Clasp “B” Concrete
Headwalls
11030 Lbs, Bar Reinforcing Steel
428 Lin. Ft.—ls” Pipe SD
332 Lin. Ft, 18" Pipe SD
180 Lin. Ft.—lß" Pipe CD
135 Lin. Ft. 24’’ Pipe CD
45 Lin. Ft. 30" Pipe CD
124 Lin. Ft 30" 12 Ga. Cor. Met.
Pipe CD
109 Lin. Ft. 42" 10 Ga. Cor. Met.
Pipe CD
1000 Lin. Ft. 6" Perforated Pipe
Underdrain
402 Lin. Ft. Culvert Pipe Remov
ed. SD or CD
12.7 Sq. Yds. Plain Sand Cement
Bag Rip Rap
40 Each Concrete R|W Markers
70740 Sq. Yds. - Seeding Slopes,
Shoulders, Ditches & Side Drains
70740 Sq. Yds. Mulching
782 Sq. Yds Sod Ditch Checks
0.8 M. Gals. Water for Grassing
0.07 Tons First Application Fer
tilizer
23 Lbs. Second Application Fer
tilizer
1 Each Reflectorized Guide Mark
er, Type 5
5 Cu. Yds. Remove Rubble Mason
ry Headwall
LUMP SUM Remove Wood Box
Culvert, Sta. 7Plusß2
LUMP SUM Remove Existing
Bridge, Sta. lllPlusOS
1 Each Remove FAP Marker
1 Each Reset FAP Marker
100 Lin. Ft. Guard Rail
330 Lin. Ft. (Reinforced Concrete
Approach Slabs
12 Each Concrete Drop Inlet Spill
, ways, Std. 9017, Type “A”, 1
Grate
535 Lin. Ft. 8" Cor. Met. Pipe
Slope Drain
204 Lin. Ft. 9’’ x 6" Concrete
Header with Raised Edge
32183 Cu. Yds. Class "B” Sand
Clay Base. Including Material
348233 Unit Yds. Overhaul on Base
Material
■3294 Cu. Yds Stabilizer Aggregate
Including Material
20548 Gals. Cutback Asphalt
Prime
50012 Sq. Yds. Single Surface
Treatment. Type 1
50012 Sq. Yds. Liquid Seal
27109 Sq. Yds. Finishing & Dress
ing
DETOUR QUANTITIES
10800 Cu. Yds Unclassified Exca
vation & Borrow, Including De
tour Removal & Including Mat
erial
902 Cu. Yds. Class "B” Sand Clay-
Base, Including Material
8451 Unit Yds. Overhaul on Base
Material
135 Cu. Yds.- Stabilizer Aggregate,
Including Material
850 Gals. Cutback Asphalt Prime
2300 Sq. Yds.— Single Surface
Treatment, Type 1
2300 Sq. Yds.—Liquid Seal
LUMP SUM- Remove Existing
Bridge, Sta. 36P1u900
LUMP SUM Shifting Existing
Bridge, Sta. 35Plus00
APPROXIMATE QUANTITIES
FOR THE BRIDGE ARE AS FOL
LOWS:
20 Cu. Yds.—Class “A” Concrete
90 Cu. Yds. —Class “AA” Concrete
39119 Lbs. Bar Reinforcing Steel
219 Lin. Ft.— Guard Rail-Boam
Type
32 Each Steel Guard Rail Posts
720 Lin. Ft.- Steel H-Piling, 10”
at 42 Lbs.
2 Each Steel H-Test Piles, 10”
at 42 Lbs.
1 Each- Loading Test
100 Cu. Yds. Channel Excavation
960 Lbs. Structural Steel
0.298 Acres Clearing & Grubbing—
Lump Sum
800 Cu. Yds. Stone Dumped Rip
Rap
LUMP SUM Remove Existing
Bridge, Sta. 11P1us16
LUMP SUM—Construct, Maintain
& Remove Detour Bridge, Sta.
11P1us16
Said work shall begin within ten
(10) days after formal execution
of contract and shall be completed
within 200 working days. When
contract has been executed, writ
ten notice shall be given the Con
tractor, at which time, and not be
fore, work may be started.
Contract executed pursuant to
this Notice is binding on the State
Highway Department, as such.
Said contract will not create liabi
lity, expressed or implied, against
the undersigned Chairman of the
State Highway Board, as an indi
vidual nor against any employee
of the State Highway Department,
in his or her individual capapcity.
The minimum wage to be paid
under this contract shall be the
amounts set out In the Labor Pro
visions included in the Proposal.
The attention of bidders is directed
to the Special Provisions covering
employment of labor, methods of
construction, subletting or assign
ing the contract and to the use of
domestic materials.
Plans and specifications are on
file at the office of the undersign
ed at Atlanta, and at Gainesville,
Georgia, and at the office of the
Board of County Commissioners of
Forsyth & Hall Counties at Cum
ming, Ga., and Gainesville, Georgia
where they may be inspected free
of charge. Copies of the plans may
be obtained upon payment in ad
vance of the sum of $ll.OO. Copies
A lineman's “climbers” have short, sharp, thick steal
spurs called gad's. Whenever a lineman sinks his
gaffs into a creosoted Georgia pine power pole, he
leaves his marks of sen-ice. You have seen them
everywhere, along dusty country roads and busy
city streets.
The lineman leaves these marks when he builds a
power line to bring you electric sen-ice, when he
works on the line to keep your service from being
interrupted, and when he makes emergency repairs
to restore your service.
More than 500 of our employes are qualified to
wear climbers. The thousands of marks they leave
daily have a single objective: to make sure that when
*
you dip a switch, the lights go on, the motor starts,
the work gets done.
GEORGIA POWER COMPANY
A CITIZEN WHEREVER WE SERVE
The Forsyth County New*
of the General Specifications may
be obtained upon payment in ad
vance of the sum of S3.WO, which
sums will not be refunded.
Proposals must be submitted on
regular forms, which will be sup
plied by the undersigned, and may
be obtained by a payment, in ad
vance of $5.00 for each proposal
issued. .When the proposal is sub
mitted, it muftt be accompanied hy
a certified check, cashier’s check,
negotiable United States Bonds, or
other acceptable security in the
amount of $3000.00, and must be
plainly marked “Proposal for Road
Construction,” County and Num
ber, and show the time of opening
as advertised. Check of the low
bidder will be cashed and all other
checks will be returned as soon as
the contract is awarded, unless it
is deemed advisable by the State
Highway Department to hold one
or more checks. If an unusual con
dition arises, the State Highway
Department reserves the right to
cash all checks. Bidders Bond will
not be accepted. Bond will be re
quired of the successful bidder as
• required by law.
Contracts will not be awarded to
contractors who have not been
placed on the list of qualified Con
tractors prior to the date of award.
No proposal will be issued to any
bidder later than 9 AM Eastern
Standard Time of the date of open
ing bids.
All bids must show totals for
each item and total amount of bid.
Right is reserved in the undersign
ed to delay the award of the con
tract for a period not to exceed
thirty (30) days from the date of
opening bids, during which period
bids shall remain open and not sub
ject to withdrawal. Right is also
reserved in the undersigned to re
ject any and all bids and to waive
all formalities.
Upon compliance with the re
quirements of the Standard Speci
fications, Ninety (90) percent of
the amount of work done in any
calendar month will be paid for by
the 25th. day of the succeeding
month, provided that payrolls have
been submitted as required and the
remainder within thirty (30) days
after the Final Statement is ap
proved by the Engineer.
This the Ist day of August, 1955.
STATE HIGHWAY DEPART
MENT OF GEORGIA
W. A. Blasingame, Chairman
TIMBER NOTICE
Timber that is piled and scheduled
for burning within the reservoir
area above Buford Dam in Gwin
nett, Hall, Forsyth, Dawson and
Lumpkin counties, Georgia, is av
ailable to the public without charge
provided that interested parties
must first contact the Wade Lahar
Construction Company, Phone No.
Le-4-4039, Gainesville, Ga., concern
ing requirements to be met before
entering the work area.
ENGINE SPECIALS !
OTWELL MOTOR COMPANY IS OFFERING
GENUINE AUTHORIZED FORD RECONDI
TIONED ENGINES INSTALLED AT THE
FOLLOWING “UNHEARD” of SPECIALS
V-8 Ford Car., 1939-42 for $139.47
V-8 Ford Cars, 1946-48 for $140.47
“Red” or Extra power engines for cars & trucks
$15.00 extra.
V-8 Ford Truck*, 1945-53 $182.75
These engines have Special none burning valves
that list for $6. each.
V-8 Ford Cars, 1949-53 $160.79
6-cyl. Ford cars & trucks, 1942-47 .... $150.35
6-cyl. Ford cars, 1948-51 and 6 cyl. Ford Trucks
1948-53 with regular engines $161.35
6-cyl. Ford Trucks with “Big Six” engines thru
1953 $174.50
6-cyl. Ford cars, 1952-53-Complete engine as
sembly - Lower assembly and head assembly
$185.00 or Lower assembly only $132.00. Parts
to overhaul head assembly extra.
These prices are subject to cracked condition
of your present Block and Heads Tune up
parts, Oil and State Tax not included.
SEE, Call or Write Alton Wheeler, Ph. 2279
or Guy Lummus, Ph. 7314 for appointments.
Otwell Motor Company
The House Service Built
Phones 2311 • 2312 Gumming, Ga.
/ V* vy 4 \ t L ~*' • * y J
The popularity of OK Used Cars is growing
by leaps and bounds among all kinds of buy
ers! It’s no wonder whan you see that the OK
symbol means not only a thoroughly inspected
and reconditioned car-but one carrying the
dealer’s written warranty!
* J
i
I Sold only by on Authorized Chevrolet Dealer
ANDEAN MOTOR COMPANY
Cumming, Georgia
There is something about the female that mak
es her easy prey to jealousy.* It rnay r be the ten
dency of the male to drift a bit, in part
Most of the hoorah among business men and
chambers of commerce is aimed at the dollar,
which, in turn, helps a community
The race for industry in some sections of the
country has reached a competitive stage the Rus
sians would find hard to believe
Thursday, August 11, 1955.
bseo i
Tag!
./ 5h " < '*.. 7 fcpj .
*&*'s••* / yTHfilr
—* l W f :
D
O